Skip to main content

Alaska Railroad to get Wabtec PTC

Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems. The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service. Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 loc
April 3, 2014 Read time: 2 mins
6079 Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems.  The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service.

Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 locomotives.  Wabtec's scope of work also includes installation of its train management and dispatch system (TMDS), a computer-aided dispatch system to be used for centralised traffic control and track warrant control for all territories; and integration of I-ETMS with Wabtec's back office system.  The Alaska Railroad system will be fully interoperable with PTC systems being implemented by Class I railroads in the US.

Albert J. Neupaver, Wabtec's chairman and chief executive officer, said:  "PTC continues to be developed and deployed by freight and passenger railroads in the US and this project with Alaska Railroad demonstrates the variety of capabilities we have to assist our customers."

Eileen Reilly, vice president of Advanced Train Control Systems and Technology for Alaska Railroad, said:  "Wabtec understood our needs and delivered the computer-aided dispatch that is the cornerstone of our PTC project.  We look forward to our continued successful relationship as we implement the I-ETMS PTC at the Alaska Railroad."

For more information on companies in this article

Related Content

  • Fleet management systems likely to become standard fitting in the Americas
    July 6, 2012
    According to a new research report, Fleet management in the Americas, from Berg Insight, the number of fleet management systems deployed in commercial vehicle fleets in North America was 2.8 million in Q4-2011. Growing at a compound annual growth rate (CAGR) of 15.9 per cent, this number is expected to reach 5.9 million by 2016. In Latin America, the number of installed fleet management systems is expected to increase from 1.3 million in Q4-2011, growing at a CAGR of 16.6 per cent to reach 2.8 million in 20
  • GMV to provide account-based ticketing for Cyprus buses
    November 16, 2023
    Company will build on existing smart card system on 750 vehicles
  • Tolling is still stuck on the sidelines says ASECAP speaker
    August 19, 2015
    Geoff Hadwick attended ASECAP’s 2015 Study Days meeting in Lisbon and found a frustrated European tolling sector undertaking some soul searching. The international road tolling industry its failing to make it case and the sector is losing out to a range of other socio-political lobby groups according to International Bridge, Tunnel and Turnpike Association (IBTTA) chief executive Pat Jones. Speaking at the recent 2015 ASECAP Study Days conference in Lisbon, Jones issued a stark warning: “Tolling is still o
  • Xerox Achieves ISO 9001 Quality Management System certification
    March 7, 2014
    Following a multi-location assessment of seven work sites Xerox’s Government and Transportation Sector Technology Delivery Center (GTS TDC) has achieved ISO 9001:2008 Quality Management System certification. Xerox GTS TDC designs, develops and delivers technology transportation solutions in electronic tolling, parking, photo enforcement, fare collections and management, and computer-aided dispatch/automatic vehicle location (CAD/AVL) systems. The assessment found that Xerox GTS TDC yielded ‘zero nonco