Skip to main content

AECOM to design Singapore’s high speed rail infrastructure

Singapore’s Land Transport Authority (LTA) has appointed AECOM Singapore to conduct the advanced engineering study (AES) for the complete design of the high speed rail (HSR) infrastructure within Singapore. This includes providing architectural, civil, electrical, mechanical and other design services required for the Jurong East terminus, tunnels, and the bridge across the Straits of Johor. The Kuala Lumpur-Singapore HSR is a strategic project between the Governments of Malaysia and Singapore that aims t
February 8, 2017 Read time: 1 min
Singapore’s Land Transport Authority (LTA) has appointed AECOM Singapore to conduct the advanced engineering study (AES) for the complete design of the high speed rail (HSR) infrastructure within Singapore. This includes providing architectural, civil, electrical, mechanical and other design services required for the Jurong East terminus, tunnels, and the bridge across the Straits of Johor.

The Kuala Lumpur-Singapore HSR is a strategic project between the Governments of Malaysia and Singapore that aims to deliver seamless travel between the two capital cities and enhance business. The 350-km line will have eight stations, including Singapore and Kuala Lumpur, cutting travel time between Singapore and Kuala Lumpur to 90 minutes.

The HSR is expected to be completed by 31 December 2026.

Related Content

  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • Terrestrial solution to stellar shortcomings
    December 5, 2013
    Inherent weaknesses in satellite communications are leading several countries to re-evaluate terrestrial-based backup systems. There is a tale frequently told in satellite navigation circles, of how landing systems at Newark Airport were disrupted by a truck driver using GPS jamming equipment as he drove along the New Jersey Turnpike. While there was no threat to flight safety as the interference to GPS reference stations being tested, the story highlights how apparently benign threats have the potential t
  • Indra ticketing starts in Riyadh
    December 11, 2024
    New system is part of €266m public transit deal in Saudi Arabian capital
  • High Speed 2 should be part of integrated transport policy
    September 13, 2013
    The UK’s Institution of Engineering and Technology (IET) is calling for the High Speed 2 (HS2) proposals to be reassessed to become part of an integrated transport programme of metro, rail, bus and road projects to revitalise the cities of the Midlands and North. The call comes as the Transport Secretary Patrick McLoughlin reasserted the case for the new rail line. Prof Phil Blythe, chair of the IET Transport Policy Panel, said: “We are supportive in principle of high speed rail, but we believe that