Skip to main content

AECOM to design Singapore’s high speed rail infrastructure

Singapore’s Land Transport Authority (LTA) has appointed AECOM Singapore to conduct the advanced engineering study (AES) for the complete design of the high speed rail (HSR) infrastructure within Singapore. This includes providing architectural, civil, electrical, mechanical and other design services required for the Jurong East terminus, tunnels, and the bridge across the Straits of Johor. The Kuala Lumpur-Singapore HSR is a strategic project between the Governments of Malaysia and Singapore that aims t
February 8, 2017 Read time: 1 min
Singapore’s Land Transport Authority (LTA) has appointed AECOM Singapore to conduct the advanced engineering study (AES) for the complete design of the high speed rail (HSR) infrastructure within Singapore. This includes providing architectural, civil, electrical, mechanical and other design services required for the Jurong East terminus, tunnels, and the bridge across the Straits of Johor.

The Kuala Lumpur-Singapore HSR is a strategic project between the Governments of Malaysia and Singapore that aims to deliver seamless travel between the two capital cities and enhance business. The 350-km line will have eight stations, including Singapore and Kuala Lumpur, cutting travel time between Singapore and Kuala Lumpur to 90 minutes.

The HSR is expected to be completed by 31 December 2026.

Related Content

  • LA confirms $133m transit contracts
    April 5, 2021
    Sepulveda Transit Corridor Project includes rail and monorail solutions for busy road routes
  • Pöyry takes major role in Helsinki City rail loop design
    January 10, 2014
    In a contract worth US$6.4 million, Finnish engineering firm Pöyry is to design the Vauhtitie underpass bridge, the opening of the nearby railway tunnel, and the road layout of the Vauhtitie area of Helsinki for the Helsinki City rail loop. In addition, Pöyry's water maintenance network designers will design the pipe and cable transfers required by the rail loop. Pöyry architects are also involved in the design of the Hakaniemi station and its road tunnels. The Helsinki City rail loop is a commuter rail
  • Speed limits: is 20 really plenty?
    June 16, 2020
    Speed kills – which means cutting speed should cut collisions. But is it that simple?
  • Data helps Ohio DoT get grant money
    January 25, 2022
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…