Skip to main content

AECOM and PB JV for Los Angeles regional connector

The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
April 23, 2012 Read time: 2 mins
RSSThe 1795 Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of 3525 AECOM and 4983 Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.

The underground rail connection will link the Metro Gold and Blue lines with the new Expo light rail through downtown Los Angeles, enabling passengers to travel from Azusa to Long Beach and from the Eastside to Culver City.

In tying together light rail lines in downtown L.A., the Regional Connector will provide major regional north/south and east/west rail line linkages that will give transit commuters a one-seat, one-ticket ride and significant travel time savings not available today. The connection itself will save approximately 20 minutes of time by eliminating line transfers through downtown. The project is estimated to provide access to 90,000 passengers daily, including 17,000 new transit riders by 2035.

The AECOM/PB joint venture, known as the Connector Partnership, will be responsible for creating an advanced conceptual plan for the project as well as preliminary engineering, with options for design support during construction and system activation.  The joint venture will also assist LACMTA with project controls and risk assessment.
Construction on the connector could begin in 2013 and be completed by 2019, depending on the availability of federal funding.

For more information on companies in this article

Related Content

  • Commuting habits come under scrutiny
    March 28, 2017
    Cities have a moral responsibility to encourage the smart use of transportation and Andrew Bardin Williams hears a few suggestions. Given the choice of getting a root canal, doing household chores, filing taxes, eating anchovies or commuting to work, nearly two-thirds of Americans said that they wouldn’t mind commuting into work—at least according to a poll conducted by Xerox (now Conduent) over its social media channels at the end of 2016.
  • Parsons Brinckerhoff to provide quality control for Cleveland bridge
    February 14, 2014
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • Luton to Dunstable guided busway opens
    September 25, 2013
    Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
  • Santiago metro contract awarded
    January 20, 2014
    Spain’s Isolux Corsán has been awarded a US$100 million contract for the construction of a section of line 3 of the Santiago Metro in Chile. The project, part of the Metro Project, aims to improve the entire underground network in Santiago includes the construction of a 3.7 kilometre tunnel under the Chilean capital and includes the construction of three stations, five circular shafts and two rectangular shafts over a period of 28 months. It is expected to start operating in 2018.