Skip to main content

AECOM and PB JV for Los Angeles regional connector

The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
April 23, 2012 Read time: 2 mins
RSSThe 1795 Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of 3525 AECOM and 4983 Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.

The underground rail connection will link the Metro Gold and Blue lines with the new Expo light rail through downtown Los Angeles, enabling passengers to travel from Azusa to Long Beach and from the Eastside to Culver City.

In tying together light rail lines in downtown L.A., the Regional Connector will provide major regional north/south and east/west rail line linkages that will give transit commuters a one-seat, one-ticket ride and significant travel time savings not available today. The connection itself will save approximately 20 minutes of time by eliminating line transfers through downtown. The project is estimated to provide access to 90,000 passengers daily, including 17,000 new transit riders by 2035.

The AECOM/PB joint venture, known as the Connector Partnership, will be responsible for creating an advanced conceptual plan for the project as well as preliminary engineering, with options for design support during construction and system activation.  The joint venture will also assist LACMTA with project controls and risk assessment.
Construction on the connector could begin in 2013 and be completed by 2019, depending on the availability of federal funding.

Related Content

  • April 17, 2012
    Green light for Houston light rail project
    Granite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.
  • July 4, 2012
    Meeting the challenges of smartcard fare payment
    David Crawford monitors a growing trend in contactless smartcard ticketing The north east United States has become a hive of activity in the smart fare payment arena. In October 2011, the New York Metropolitan Transportation Authority (MTA) published, as a preliminary to an imminent procurement process, the detailed concept of its New Fare Payment System (NFPS). Based on open payment industry standards, this is designed to be implemented on all MTA bus and subway services operated by New York City Transit (
  • April 25, 2012
    Siemens to build streetcars for Atlanta
    Siemens Industry has been awarded a US$17.2 million contract from Metropolitan Atlanta Rapid Transit Authority (MARTA), on behalf of the City of Atlanta and the Atlanta Downtown Improvement District, to provide Atlanta with four new streetcars. The first car is expected to be delivered in September 2012 with revenue service beginning in early 2013. These will be the first streetcars in Atlanta since 1949 and will mark Siemens entry into the streetcar market in the United States.
  • February 19, 2016
    LA metro secures federal funds for rail projects
    The US Department of Transportation has awarded US$300 million to the Los Angeles County Metropolitan Transportation Authority (Metro) for two major rail projects in Los Angeles County. This federal funding will benefit both the Regional Connector and Westside Purple Line Extension (Sections 1 and 2) transit projects. Specifically, the federal government will be providing US$100 million to the Regional Connector and US$200 million for the Westside Purple Line section 1 and 2 extension this federal fisca