Skip to main content

AECOM and PB JV for Los Angeles regional connector

The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
April 23, 2012 Read time: 2 mins
RSSThe 1795 Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of 3525 AECOM and 4983 Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.

The underground rail connection will link the Metro Gold and Blue lines with the new Expo light rail through downtown Los Angeles, enabling passengers to travel from Azusa to Long Beach and from the Eastside to Culver City.

In tying together light rail lines in downtown L.A., the Regional Connector will provide major regional north/south and east/west rail line linkages that will give transit commuters a one-seat, one-ticket ride and significant travel time savings not available today. The connection itself will save approximately 20 minutes of time by eliminating line transfers through downtown. The project is estimated to provide access to 90,000 passengers daily, including 17,000 new transit riders by 2035.

The AECOM/PB joint venture, known as the Connector Partnership, will be responsible for creating an advanced conceptual plan for the project as well as preliminary engineering, with options for design support during construction and system activation.  The joint venture will also assist LACMTA with project controls and risk assessment.
Construction on the connector could begin in 2013 and be completed by 2019, depending on the availability of federal funding.

For more information on companies in this article

Related Content

  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is
  • ITS-NY Announces 2012 Project of the Year Award Winners
    June 13, 2012
    The Intelligent Transportation Society of New York (ITS-NY) has announced the 2012 ITS-NY Project of the Year Winners at its Nineteenth Annual Meeting and Technology Exhibition in Saratoga Springs, NY. “These winning projects feature ITS and technologies at work in New York State to improve traveller mobility and safety, as well as the efficiency of New York State’s transportation system across all modes of travel,” said Dr Isaac Takyi, ITS-NY president. Winning Projects were announced in the following ITS
  • Signal optimisation reduces congestion, improves travel times
    February 2, 2012
    The Metropolitan Government of Nashville and Davidson County's Department of Public Works(MPW) identified seven corridors in the County that experience heavy traffic congestion and needed traffic signal timing improvements to improve traffic flow as well as air quality and fuel consumption. The seven corridors included a total of 223 signalised intersections. To conduct this study, termed the Traffic Signal Optimisation Study for the Metro Nashville Signal System, MPW received funding from the Federal Conge
  • Pöyry to provide technical assistance for Panama Metro
    April 16, 2012
    Pöyry's Urban & Mobility Business Group has been awarded a US$3 million contract to provide specialised technical assistance to the consortium in charge of project management for the design and construction of Line 1 of the Panama Metro. Pöyry's services are related to the implementation of the whole metro system. The project began in July 2011 and is expected to be completed by June 2014.