Skip to main content

AECOM and PB JV for Los Angeles regional connector

The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
April 23, 2012 Read time: 2 mins
RSSThe 1795 Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of 3525 AECOM and 4983 Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.

The underground rail connection will link the Metro Gold and Blue lines with the new Expo light rail through downtown Los Angeles, enabling passengers to travel from Azusa to Long Beach and from the Eastside to Culver City.

In tying together light rail lines in downtown L.A., the Regional Connector will provide major regional north/south and east/west rail line linkages that will give transit commuters a one-seat, one-ticket ride and significant travel time savings not available today. The connection itself will save approximately 20 minutes of time by eliminating line transfers through downtown. The project is estimated to provide access to 90,000 passengers daily, including 17,000 new transit riders by 2035.

The AECOM/PB joint venture, known as the Connector Partnership, will be responsible for creating an advanced conceptual plan for the project as well as preliminary engineering, with options for design support during construction and system activation.  The joint venture will also assist LACMTA with project controls and risk assessment.
Construction on the connector could begin in 2013 and be completed by 2019, depending on the availability of federal funding.

Related Content

  • Underground DART plan back on track
    May 7, 2014
    Irish Rail is set to proceed with the US$2.8 billion underground second DART rail line through the heart of Dublin city centre, following a recent High Court decision which gave the green light for the project. The line, which would run from Docklands to Inchicore, would complete the trebling of the Greater Dublin area's rail service capacity from 33 million passenger journeys annually now to 100 million passenger journeys upon completion.
  • LA metro line to be extended
    November 10, 2014
    The Skanska joint venture with Traylor Brothers, Inc. and J.F. Shea Construction has been awarded a design-build contract by the Los Angeles County Metropolitan Transportation Authority to extend the Los Angeles Metro Purple Line.
  • Government green lights road and rail improvements
    July 19, 2013
    UK Transport Secretary Patrick McLoughlin has confirmed a £1.2 billion order for more state of-the art trains to transform rail travel on one of Britain’s busiest intercity routes. The 270 carriages will be manufactured in Britain by Hitachi Rail Europe as part of the government’s overall £5.8 billion Intercity Express Programme (IEP). The trains will operate on the East Coast Main Line from 2019 and will deliver significant benefits to passengers, including boosting capacity by 18 per cent, improving trai
  • Brazil launches BRT tender
    February 20, 2015
    The city of Sorocaba in Brazil's São Paulo state has called for bids to develop a 35 kilometre bus rapid transit (BRT) system in the city budgeted at US$47 million, according to a local government tender notice. The contract, which involves building, maintaining and operating the BRT along the city's north-south and east-west corridors for 20 years, is expected to benefit some 150,000-180,000 passengers. Studies for the project have been carried out by the Consor-Ellenco and KPMG-Proficenter consortiums. Ac