Skip to main content

ADB to fund Jaipur metro extension

The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
May 30, 2014 Read time: 2 mins
The 2128 Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018.

A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by July-August 2014.

The metro will provide connections to the entire central business district. The extended line is expected to carry 126,000 passengers every day during its first year of operation. The stations along the Line 1 will connect existing and planned bus routes to help travel to other parts of the city much faster.

Officials said the ADB's loan will also help finance studies into the planned 23 kilometre long north-south line 2. This study will be completed towards the end of 2015.

Related Content

  • December 15, 2014
    Colombia seeks expressions of interest for Bogotá LRT
    Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
  • January 20, 2014
    Santiago metro contract awarded
    Spain’s Isolux Corsán has been awarded a US$100 million contract for the construction of a section of line 3 of the Santiago Metro in Chile. The project, part of the Metro Project, aims to improve the entire underground network in Santiago includes the construction of a 3.7 kilometre tunnel under the Chilean capital and includes the construction of three stations, five circular shafts and two rectangular shafts over a period of 28 months. It is expected to start operating in 2018.
  • December 4, 2012
    Success of London's Olympic public transport systems
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • September 15, 2015
    EIB backing for London transport
    The European Investment Bank (EIB) has agreed to provide US$1.5 billion for investment in the London transport network. The 35 year loan from Europe’s long-term lending institution will support major projects, including significant upgrades by Transport for London (TfL) at Victoria and Bank Tube stations, which will transform passenger access at two of the busiest stations in the capital. The new support was announced by Jonathan Taylor, vice president of the European Investment Bank and Steve Allen, ma