Skip to main content

ADB to fund Jaipur metro extension

The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
May 30, 2014 Read time: 2 mins
The 2128 Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018.

A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by July-August 2014.

The metro will provide connections to the entire central business district. The extended line is expected to carry 126,000 passengers every day during its first year of operation. The stations along the Line 1 will connect existing and planned bus routes to help travel to other parts of the city much faster.

Officials said the ADB's loan will also help finance studies into the planned 23 kilometre long north-south line 2. This study will be completed towards the end of 2015.

For more information on companies in this article

Related Content

  • The rise of EVs: it’s electrifying!
    November 9, 2021
    The projected rise and rise of electric vehicle usage means that European road surfaces are taking on new appearances to get ready
  • JV selected for Perth’s Forrestfield-Airport Link
    February 23, 2016
    The Public Transport Authority of Western Australia has selected the Salini Impregilo - NRW Joint Venture, comprising Salini Impregilo and NRW Pty, as its preferred bidder to design, construct and maintain the Forrestfield-Airport Link. The US$1.5 billion state government-funded project is a new train line that will connect Forrestfield to the city, opening up Perth’s eastern suburbs to the rail network for the first time and giving Perth Airport users a travel option five minutes faster than by car.
  • Netherlands to get nationwide network of EV fast-charging stations
    July 8, 2013
    By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
  • Inrix informs FHWA’s data improvements
    December 19, 2017
    Refinements in the data available from the US Federal Highway Administration will improve road management across America. David Crawford reports. In August 2017, the US Federal Highway Administration (FHWA) issued the first results from an upgraded version of its National Performance Management Research Data Set (NPMRDS). Developed to identify the locations and times of high congestion affecting traffic flows along America’s 259,000km (161,000 mile) national highway system, this is a key resource for sta