Skip to main content

ADB to fund Jaipur metro extension

The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
May 30, 2014 Read time: 2 mins
The 2128 Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018.

A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by July-August 2014.

The metro will provide connections to the entire central business district. The extended line is expected to carry 126,000 passengers every day during its first year of operation. The stations along the Line 1 will connect existing and planned bus routes to help travel to other parts of the city much faster.

Officials said the ADB's loan will also help finance studies into the planned 23 kilometre long north-south line 2. This study will be completed towards the end of 2015.

For more information on companies in this article

Related Content

  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
  • Apps help passengers avoided overcrowded public transport
    May 30, 2013
    David Crawford reviews innovations in the comfort zone. Anyone who rides public transport knows that, perhaps second only to delays, overcrowding is a critical part of the passenger experience,” says Nir Erez, CEO of Moovit, the Israel-based social transportation app developer. The app is aimed at taking real-time user feedback on transit and making it available to a wider audience of travellers. Currently available on iPhone and Android, it plans to add Windows 8 and other platforms in the future. Moovit i
  • Magway delivers future of transport
    January 18, 2021
    A dramatic shift towards e-commerce and home working, plus the need for sustainable deliveries, means future cities are at a crossroads, says Phill Davies of Magway
  • Scania to test electric trucks and buses in real-life conditions
    June 9, 2015
    In February 2016, Scania will begin testing electric trucks as part of the Swedish Gävle Electric Road project, which will demonstrate and evaluate conductive technology, using electric transmission through overhead lines above vehicles equipped with a pantograph power collector. The Swedish Transport Administration has now approved support for the project, which is in line with the Government’s goal of an energy-efficient and fossil-free vehicle fleet by 2030. The project consists of about US$9.2 millio