Skip to main content

ADB approves grant for BRT in Karachi

The Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan. The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes. It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycl
July 23, 2019 Read time: 2 mins

The 2128 Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan.

The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes.

It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycle lanes, improved pavements and energy-efficient streetlights.

ADB says the initiative will establish sustainable BRT operations by improving the capacity of relevant transport authorities, and will also implement a bus industry transition programme as well as deliver a BRT fleet, ITS and biogas plant.

The bank will administer an $11.8m grant to finance climate change adaptation measures and post-project emissions monitoring activities. It will also offer a $37m loan to finance the biogas plant and the incremental cost of transitioning to compressed natural gas hybrid bus technology, with the biomethane extracted from cattle waste.

As part of the project, ADB will administer two $100m loans from the Asian Infrastructure Investment Bank and the French Development Agency to finance the civil works and equipment costs.

For more information on companies in this article

Related Content

  • Transport technology transforming bus stops in Los Angeles
    January 20, 2012
    David Crawford reports on a pioneering blend of transport technology and aesthetic By gaining a design award before installation has even started, the US$6.9 million City of Santa Monica (California)'s Big Blue Bus Shelter and Branding Package has ensured early interest among what it expects to be a new wave of transit riders. The American Institute of Architects' Los Angeles chapter's recently conferred 'Next LA Citation Award for Architecture', given for design excellence in projects as yet unbuilt, comm
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • €7.2bn 'green' upgrade for Italian motorway
    November 21, 2022
    The A22 between Modena and Bolzano will offer hydrogen filling and EV charging
  • 100 more Conduent 3D Fare Gates for Philadelphia’s Septa
    December 17, 2024
    Installation is designed to reduce fare evasion at US transit agency