Skip to main content

ADB approves grant for BRT in Karachi

The Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan. The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes. It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycl
July 23, 2019 Read time: 2 mins

The 2128 Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan.

The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes.

It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycle lanes, improved pavements and energy-efficient streetlights.

ADB says the initiative will establish sustainable BRT operations by improving the capacity of relevant transport authorities, and will also implement a bus industry transition programme as well as deliver a BRT fleet, ITS and biogas plant.

The bank will administer an $11.8m grant to finance climate change adaptation measures and post-project emissions monitoring activities. It will also offer a $37m loan to finance the biogas plant and the incremental cost of transitioning to compressed natural gas hybrid bus technology, with the biomethane extracted from cattle waste.

As part of the project, ADB will administer two $100m loans from the Asian Infrastructure Investment Bank and the French Development Agency to finance the civil works and equipment costs.

Related Content

  • September 30, 2015
    Canadian JV to build next phase of Ontario BRT
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an
  • November 16, 2015
    EU funding for French metro line
    French investment firm Caisse des dépôts is to provide US$107 million of financing for the construction of line B of the Rennes metro. The European Investment Bank has already provided a loan of US$321 million for the project, which will contribute to the construction of a second metro line by 2019, linking the La Courrouze eco-district to the ViaSilva eco-suburb, along with the purchase of rolling stock, a new maintenance and sidings centre and three park-and-ride facilities. The construction of the
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • November 11, 2022
    Keeping cool in LA
    As the earth’s temperatures rise, cities are set to become hotter. A project in Los Angeles may point the way to keeping cool while improving access to transit services in an uncertain future