Skip to main content

Aberdeen opts for APT EV charging

Aberdeen City Council in Scotland has chosen electric vehicle (EV) charging from APT Technologies to support its aim to reduce air and noise pollution through encouraging the use of more sustainable and quieter transport modes. The contract also includes a three-year maintenance package. The first installation saw eight double 7kW units, two wall-mounted 7kW units and one double mixer post with 7kW and 3kW power supplies installed into local authority premises to service fleet vehicles and give council e
March 13, 2014 Read time: 2 mins
Aberdeen City Council in Scotland has chosen electric vehicle (EV) charging from 1936 APT Technologies to support its aim to reduce air and noise pollution through encouraging the use of more sustainable and quieter transport modes. The contract also includes a three-year maintenance package.

The first installation saw eight double 7kW units, two wall-mounted 7kW units and one double mixer post with 7kW and 3kW power supplies installed into local authority premises to service fleet vehicles and give council employees an incentive to use electric vehicles.

In addition, a double rapid charger (50kW DC/ 43kW AC) was installed in the city centre and similar one between the city and the airport. Two double-fast chargers (22kW) and three double 7kW chargers are located in long-stay and short-stay car parks across the city.

Scotland is one of eight places in the UK to benefit from the Office for Low Emission Vehicles (OLEV) funding as part of its “Plugged in Places” scheme. Transport Scotland, the 2112 Scottish Government Transport Agency, was responsible for distributing the funds across Scotland and allocated them through Community Planning Partnerships (CPPs), made up of councils and other public sector bodies. Initial funding was allocated to CPP premises, while the subsequent funding was to provide publicly-available charging infrastructure.

For more information on companies in this article

Related Content

  • Next stop: UK's first tram battery charge station
    May 28, 2021
    Swiss firm Furrer+Frey's wireless station designed to develop Coventry very light rail system 
  • Videalert enforces low traffic neighbourhoods
    January 20, 2021
    ANPR cameras used to issue fines to drivers without relevant residents' parking permit
  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • EVgo adds second-life batteries to fast-charging system
    July 18, 2018
    EVgo has added second-life BMW i3 batteries to its Union City fast-charging station in California to store energy during peak solar hours and reduce strain on the grid. This energy is then used to deliver a fast charge to EVgo customers’ electric vehicles during periods of high demand. The second-life battery system integrates two BMW i3 battery packs into a single housing. Evgo says each battery pack has a capacity of 22 kWh which combines with a 30 kW inverter to offer a 30 kW/44 kWh energy storag