Skip to main content

ABB to supply fast chargers for Norway electric bus project

Swiss power and automation company Asea Brown Boveri (ABB) will supply four Heavy Vehicle Chargers (HVCs) to Trondheim’s dual-manufacturer electric bus program as part of the Norwegian city's commitment to mass electric transportation. The solutions will be delivered in February 2019 and will charge 25 Volvo buses and 10 Heuliez models across four routes. Called HVC 450P, the fast chargers are said to recharge batteries in three to six minutes and provide 450 kW Direct Current output power. They utilise
March 1, 2018 Read time: 2 mins

Swiss power and automation company Asea Brown Boveri (4540 ABB) will supply four Heavy Vehicle Chargers (HVCs) to Trondheim’s dual-manufacturer electric bus program as part of the Norwegian city's commitment to mass electric transportation. The solutions will be delivered in February 2019 and will charge 25 609 Volvo buses and 10 Heuliez models across four routes.

Called HVC 450P, the fast chargers are said to recharge batteries in three to six minutes and provide 450 kW Direct Current output power. They utilise the OppCharge standard, using an overhead pantograph to connect the charger to conductive rails atop the bus and will be installed at endpoints of the routes, each between 12 and 15 kilometres-long. Buses will be recharged at the end of their routes during layover time.

The chargers are part of ABB's Ability portfolio of connected solutions, which are designed with the intention of allowing operators to monitor and configure charge points remotely.

Tide Buss will run the fleet on behalf of the Trøndelag County Council (TCC) with operations scheduled to start in August next year.

Per Olav Hopsø, head of the transport committee of the TCC said: "Working with ABB enables us to deliver a high quality and reliable solution, which allows operators from different networks to work simultaneously and share infrastructure. This not only provides good economies of scale and return on investment, but continues to support our forward-thinking approach in delivering first-rate modern infrastructure for our region. With the help of innovative companies such as ABB, public transport within the city of Trondheim will soon be fossil free.”

For more information on companies in this article

Related Content

  • Bristol trials new cycle safety technology
    June 9, 2014
    As part of an ongoing trial funded by five West of England local authorities, UK bus operator First West of England will for the first time be test driving state-of-the-art cycle safety technology on two of its buses on the busy Gloucester Road route in the city of Bristol. Developed by Fusion Processing, CycleEye technology aims to reduce the growing number of cyclist collisions and casualties across the country involving large commercial vehicles. CycleEye is fitted to the side of the vehicle and
  • GE Energy forges charger agreement with Coda Automotive
    March 23, 2012
    GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, Coda Automotive.
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • Telensa lights up Hertfordshire
    November 27, 2014
    More than 12,600 street lights on Hertfordshire’s A-roads are being upgraded to LED lighting using Telensa’s PLANet street light central management system (CMS), which will allow the lights to be monitored from a central point. This will reduce inspection costs and make it easier to spot and repair any faults. The system will also allow lighting levels on the A-roads to be reduced during the night, rather than turning lights off completely. Once the new lights are installed, light levels will be reduced