Skip to main content

ABB to supply fast chargers for Norway electric bus project

Swiss power and automation company Asea Brown Boveri (ABB) will supply four Heavy Vehicle Chargers (HVCs) to Trondheim’s dual-manufacturer electric bus program as part of the Norwegian city's commitment to mass electric transportation. The solutions will be delivered in February 2019 and will charge 25 Volvo buses and 10 Heuliez models across four routes. Called HVC 450P, the fast chargers are said to recharge batteries in three to six minutes and provide 450 kW Direct Current output power. They utilise
March 1, 2018 Read time: 2 mins

Swiss power and automation company Asea Brown Boveri (4540 ABB) will supply four Heavy Vehicle Chargers (HVCs) to Trondheim’s dual-manufacturer electric bus program as part of the Norwegian city's commitment to mass electric transportation. The solutions will be delivered in February 2019 and will charge 25 609 Volvo buses and 10 Heuliez models across four routes.

Called HVC 450P, the fast chargers are said to recharge batteries in three to six minutes and provide 450 kW Direct Current output power. They utilise the OppCharge standard, using an overhead pantograph to connect the charger to conductive rails atop the bus and will be installed at endpoints of the routes, each between 12 and 15 kilometres-long. Buses will be recharged at the end of their routes during layover time.

The chargers are part of ABB's Ability portfolio of connected solutions, which are designed with the intention of allowing operators to monitor and configure charge points remotely.

Tide Buss will run the fleet on behalf of the Trøndelag County Council (TCC) with operations scheduled to start in August next year.

Per Olav Hopsø, head of the transport committee of the TCC said: "Working with ABB enables us to deliver a high quality and reliable solution, which allows operators from different networks to work simultaneously and share infrastructure. This not only provides good economies of scale and return on investment, but continues to support our forward-thinking approach in delivering first-rate modern infrastructure for our region. With the help of innovative companies such as ABB, public transport within the city of Trondheim will soon be fossil free.”

For more information on companies in this article

Related Content

  • Mitsubishi consortium receives letter of conditional acceptance for Doha Metro
    February 23, 2015
    A consortium of Mitsubishi Heavy Industries, Mitsubishi Corporation; Hitachi, The Kinki Sharyo and Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019. Qatar Rail is the owner and manager of Qatar’s rail network and respo
  • Gothenburg’s new electric bus route wins European sustainability prize
    November 25, 2015
    The ElectriCity 55 electric bus route in Gothenburg, Sweden has been awarded the European Solar Prize 2015 in the Transport and Mobility category as the best example of sustainable public transport operated using renewable energy. The prize, awarded by the European Association for Renewable Energy, Eurosolar, is awarded to European sustainability projects in a number of different areas.
  • Port Authority of New York to go all-electric
    November 2, 2018
    A leading US public transportation agency has become the first in the country to embrace the Paris Climate Agreement, and will introduce an all-electric airport shuttle bus fleet. The voluntary Paris deal is aimed at curbing global temperature rise to under 2 degrees Celsius. As part of a commitment to achieving this, the Port Authority of New York and New Jersey says it will aim to reduce greenhouse gas (GHG) emissions by 35% by 2025 – and 80% by 2050. Its shuttle fleet will consist of 36 electric vehicl
  • Government funding for Lincoln transport hub
    August 25, 2016
    The UK government has announced funding for the Lincoln transport hub, including a new bus station and 1,000 space car park. There will also be improvements to Lincoln Central railway station and a pedestrianised plaza connecting the bus and rail stations. As part of the upgrade, the new bus station will provide live travel information for both bus and rail passengers, while the 1,000 space multi-storey will have up to 32 electric vehicle charging points to power the next generation of vehicles. Cycle