Skip to main content

ABB, Scania trial electric buses in Sweden

Swiss power and automation technology company ABB is to provide two ABB HVC300P fast-chargers for a Scania electric bus trial in Östersund, Sweden. The chargers are based on OppCharge, an open interface for the automated charging of electric buses from any manufacturer, and use a pantograph on the infrastructure to connect the bus to the charging point. The buses will be operated by Nettbuss, a subsidiary of the Norwegian State Railways, NSB. The two charging stations will be built at both ends of a 14-kilo
May 3, 2017 Read time: 2 mins
Swiss power and automation technology company 4540 ABB is to provide two ABB HVC300P fast-chargers for a 570 Scania electric bus trial in Östersund, Sweden. The chargers are based on OppCharge, an open interface for the automated charging of electric buses from any manufacturer, and use a pantograph on the infrastructure to connect the bus to the charging point.


The buses will be operated by Nettbuss, a subsidiary of the Norwegian State Railways, NSB. The two charging stations will be built at both ends of a 14-kilometre bus line and will power six fully-electric buses. With 10-minute charging, the buses will run every 15 minutes, making 100 journeys each day. ABB’s fast-chargers are connected to the cloud for remote diagnostics and management and receive over-the-air software upgrades to ensure maximum availability.

Trials are due to begin in the final quarter of 2017 and will be carried out in collaboration with public authorities, including the City of Östersund, the municipality of Krokom, the Region Jämtland Härjedalen's Public Transport Authority, the publically owned energy supplier Jämtkraft and the 746 Swedish Transport Administration.

Related Content

  • March 27, 2020
    California e-dreaming with ABB
    Data can unlock the costs and benefits of converting commercial fleets to electric vehicles.
  • April 9, 2014
    Gothenburg’s year of congestion charging
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • November 9, 2017
    Mobinet counters weighty cross border concerns
    A Mobinet pilot is combining onboard weighing with V2X comms to streamline vehicle weight enforcement. David Crawford reports. Pan-European, cross-border weigh-in-motion (WIM) for trucks is now a practical possibility, following successful Scandinavian trials within the EU-co-funded Mobinet (Internet of Mobility) programme. New technology is using strain sensors, located on load-bearing components and routinely installed in truck fleet management systems.
  • July 17, 2012
    Charging station infrastructure boost to electric vehicle use
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b