Skip to main content

ABB, Scania trial electric buses in Sweden

Swiss power and automation technology company ABB is to provide two ABB HVC300P fast-chargers for a Scania electric bus trial in Östersund, Sweden. The chargers are based on OppCharge, an open interface for the automated charging of electric buses from any manufacturer, and use a pantograph on the infrastructure to connect the bus to the charging point. The buses will be operated by Nettbuss, a subsidiary of the Norwegian State Railways, NSB. The two charging stations will be built at both ends of a 14-kilo
May 3, 2017 Read time: 2 mins
Swiss power and automation technology company 4540 ABB is to provide two ABB HVC300P fast-chargers for a 570 Scania electric bus trial in Östersund, Sweden. The chargers are based on OppCharge, an open interface for the automated charging of electric buses from any manufacturer, and use a pantograph on the infrastructure to connect the bus to the charging point.


The buses will be operated by Nettbuss, a subsidiary of the Norwegian State Railways, NSB. The two charging stations will be built at both ends of a 14-kilometre bus line and will power six fully-electric buses. With 10-minute charging, the buses will run every 15 minutes, making 100 journeys each day. ABB’s fast-chargers are connected to the cloud for remote diagnostics and management and receive over-the-air software upgrades to ensure maximum availability.

Trials are due to begin in the final quarter of 2017 and will be carried out in collaboration with public authorities, including the City of Östersund, the municipality of Krokom, the Region Jämtland Härjedalen's Public Transport Authority, the publically owned energy supplier Jämtkraft and the 746 Swedish Transport Administration.

Related Content

  • May 21, 2014
    Volvo Group studies potential to test electric roads in a city
    The Volvo Group is now taking the next step in the development of sustainable transport solutions. In collaboration with the Swedish Transport Administration, the Volvo Group will study the potential for building electric roads, where city buses can be charged from electricity in the road at the same time as the bus is in operation. The benefit is quieter and more climate-smart public transport. A 300- to 500-metre electric road may be built for test operations in central Gothenburg during 2015. The tech
  • May 19, 2015
    First electric car ferry goes into operation in Norway
    The world’s first electrical car and passenger ferry powered by batteries has entered service in Norway. The unique solution is a result of a competition that Ministry of Transport and Communications and the Norwegian Public Roads Administration launched in 2010. The ferry only uses 150 kWh per route, which corresponds to three days use of electricity in a standard Norwegian household. Built in conjunction with shipbuilder Fjellstrand, Siemens installed the complete electric propulsion system and install
  • October 16, 2014
    Europe-wide demonstration of electric buses begins in Barcelona
    A major step towards greener urban public transport was made this week with the launch of the first ZeEUS (Zero Emission Urban Bus System) demonstration in Barcelona. The flagship project is the first of its kind to test 12 metre-plus electric buses in real operation. Barcelona is the first demonstration site of the UITP-coordinated ZeEUS project, with core demonstrations in seven other European cities to follow: London and Glasgow; Stockholm; Münster and Bonn, Plzen and Cagliari. In total, 35 plug-in hy
  • October 31, 2012
    Vienna’s first electric bus goes into operation
    The first electric bus (eBus) to be used in Austria’s capital city of Vienna has been put into service by the municipal transport authority, Wiener Linien, the first operator in Europe to implement and integrate eBuses into scheduled service. Designed and developed by Siemens Rail Systems and bus manufacturer Rampini, the vehicle is the first of twelve with which Wiener Linien intends to move two of the city's bus services to electric power by the summer of 2013. The vehicle’s total energy requirement is st