Skip to main content

ABB installs 15 fast chargers for electric vehicles, Iceland

ON Power, a part of Reykjavik Energy, has signed a contract with ABB for the delivery and installation of 15 Terra multi-standard DC chargers type 53 CJG at various points along Iceland’s main highway. It is part of a plan to expand an e-mobility strategy by increasing the availability of charging stations along central locations of the country’s national highway. The fast chargers can charge an electric vehicle (EV) between 15-30 minutes. It features touch screen displays and graphic visualization
November 8, 2017 Read time: 2 mins

ON Power, a part of Reykjavik Energy, has signed a contract with 4540 ABB for the delivery and installation of 15 Terra multi-standard DC chargers type 53 CJG at various points along Iceland’s main highway. It is part of a plan to expand an e-mobility strategy by increasing the availability of charging stations along central locations of the country’s national highway.

The fast chargers can charge an electric vehicle (EV) between 15-30 minutes. It features touch screen displays and graphic visualization together with low operational noise. All chargers can be combined with comprehensive solutions for user authorization, payment and network connectivity.

There are over 1,400 EVs on the road in Iceland, which is partly due to a state-financed incentive program, which supports the purchase of electric vehicles.

Frank Muehlon, head of ABB’s Global Business for Electric Vehicle Charging Infrastructure, said: “Iceland is a progressive country, which introduces new energy standards and makes use of the country’s sustainable energy resources to support its infrastructure. The advantages with this type of fast charger can be found in the multi-protocol design, which supports cloud-based technology. This gives ON Power access to real time data for the remote control and proactive control of the operation and technical status of the charging stations. This gives a fully flexible overview of the entire charging network”.

Muehlon added that the system can function at temperatures down to minus 35 degrees.

For more information on companies in this article

Related Content

  • ABB charging technology available in 95% EV countries
    January 24, 2018
    ABB has announced that its charging technology is now available in 95% of the world’s countries with an electric vehicle (EV) presence. It has also confirmed that its sales of DC fast chargers have exceeded 6,500 ranging from 50 kW up to 450kW which also includes high-power chargers for both cars and buses. The technology is designed with the intention of supporting global e-mobility charging standards.
  • ABB launches EV chargers for US and Europe
    May 31, 2013
    ABB has launched its Terra SmartConnect (SC) fast chargers for electric vehicles (EV) in North America. Terra SC can fully charge an electric car in thirty to 120 minutes and will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be available in the Americas in the second quarter of 2013. The charger has a full-colour eight inch touchscreen user interface, smart connectivity features and wall-mount connections, as well as optional features of RFiD a
  • Netherlands to get nationwide network of EV fast-charging stations
    July 8, 2013
    By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
  • ABB delivers 20 EV chargers to Egypt
    July 16, 2019

    4540 ABB is supplying 20 DC fast chargers across Egypt which it says can recharge electric vehicles (EVs) in 15 minutes.

    The company says the deployment supports Egypt’s plans to reduce air pollution by 50% by 2023.

    The Terra 53 DC fast chargers are being installed at National Petroleum Company gas stations across the country’s road network, car dealerships and busy urban areas.

    Each charger comes with ABB Ability connected services, which continuously collects data to remotely monitor and control the operation of the chargers.