Skip to main content

ABB delivers 20 EV chargers to Egypt

July 16, 2019 Read time: 1 min

4540 ABB is supplying 20 DC fast chargers across Egypt which it says can recharge electric vehicles (EVs) in 15 minutes.

The company says the deployment supports Egypt’s plans to reduce air pollution by 50% by 2023.

The Terra 53 DC fast chargers are being installed at National Petroleum Company gas stations across the country’s road network, car dealerships and busy urban areas.

Each charger comes with ABB Ability connected services, which continuously collects data to remotely monitor and control the operation of the chargers.

The project is part of an agreement with commercial agency Arab Consulting Office and an EV charging network called Revolta Egypt.

For more information on companies in this article

Related Content

  • Scania delivers hybrid buses to Madrid
    May 13, 2016
    As part of its measures to reduce pollution in the city, the City of Madrid is to take delivery of 51 hybridised Scania Citywide buses in June. These feature cost-saving and emission-reducing hybrid technology that meets the EU suburban and short distance Class II regulations. Madrid recently enforced tough temporary measures to tackle pollution, including limiting speed limits and banning passenger car access to the city centre if nitrogen oxide levels exceed acceptable levels. In parallel, the Madrid t
  • CES 2020: ITS does Vegas
    March 3, 2020
    Keen to find out what the future holds, 170,000 people gathered in Las Vegas for CES 2020 to see 20,000 product debuts and 4,400 exhibitors... and ITS International was there too (All images: CES®)
  • Western US governors collaborate on EV corridor
    December 22, 2016
    The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
  • Best laid plans
    March 22, 2012
    Colossal is not too bold a word to describe the scale of ITS developments currently under way in Europe. The European Commission’s ITS Action Plan has six areas of focus, each of which expands out into numerous projects involving a lot of leg work by various committees, working groups or consultants. Add to that the supporting work and research efforts of the many parts of Ertico (ITS Europe); plus each of the 27 European Union member states is working on ‘transition’ of the EU’s ITS Directive into their ow