Skip to main content

ABB delivers 20 EV chargers to Egypt

July 16, 2019 Read time: 1 min

4540 ABB is supplying 20 DC fast chargers across Egypt which it says can recharge electric vehicles (EVs) in 15 minutes.

The company says the deployment supports Egypt’s plans to reduce air pollution by 50% by 2023.

The Terra 53 DC fast chargers are being installed at National Petroleum Company gas stations across the country’s road network, car dealerships and busy urban areas.

Each charger comes with ABB Ability connected services, which continuously collects data to remotely monitor and control the operation of the chargers.

The project is part of an agreement with commercial agency Arab Consulting Office and an EV charging network called Revolta Egypt.

For more information on companies in this article

Related Content

  • Uber introduces bus service in Egypt
    December 17, 2018
    Uber has launched its Uber Bus service in Egypt as part of a strategy to provide commuters living in Cairo with an affordable transportation option. The service can be accessed via Uber’s standard app. Uber groups passengers travelling in the same direction to make the service more affordable and reduce the number of stops per trip. Dara Khosrowshahi, Uber CEO, says: “We are committed to broadening access to the Uber platform with a range of low-cost options that will move more people around town an
  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • ITS Australia Awards: finalists revealed
    November 29, 2022
    Cisco, Moovit and Q-Free are among the companies up for 13th ITS Australia Annual Awards