Skip to main content

ABB to deliver fast charging solution to Denmark

Asea Brown Boveri (ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019. ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the
June 1, 2018 Read time: 1 min

Asea Brown Boveri (4540 ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019.

ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the bus to the charging point.

Additionally, four ABB HVC-Overnight Chargers will be installed at the bus depot. These chargers come with ABB Ability connected solutions to help network operators monitor and configure the charge points remotely.

For more information on companies in this article

Related Content

  • Tel Aviv road goes electric
    September 24, 2020
    Pilot aimed at improving city's air quality involves ElectReon and Dan Bus Company
  • The afterlife of spent electric vehicle batteries
    April 20, 2012
    Earlier this year, General Motors signed a definitive agreement with ABB Group to identify joint research and development projects that would reuse Chevrolet Volt battery systems, which will have up to 70 per cent of life remaining after their automotive use is exhausted. Recent research conducted by GM predicts that secondary use of 33 Volt batteries will have enough storage capacity to power up to 50 homes for about four hours during a power cut.
  • Omnitron releases high-power PoE switches
    October 15, 2018
    Omnitron Systems says its high-power Power over Ethernet (HPoE) switches enable fibre optic distance extension to HPoE powered devices. Sankar Ramachandran, Omnitron’s product marketing director, says the PoE RuggedNet and OmniConverter fibre switches allow users to deploy Pan-Tilt-Zoom cameras with heaters and blowers, small cells, and multi-stream wireless access points at any distance from the head end network equipment. According to Ominitron, the RuggedNet is designed for transportation and Internet
  • Parkeon scoops ticketing deal in Cape Town
    August 18, 2016
    Golden Arrow Bus Services (GABS), the principal bus operator in Western Cape, South Africa, has selected Parkeon’s on-bus and back office technology to help deliver its future ticketing strategy for Cape Town and its metropolitan area. The deal includes 1,250 Wayfarer200 driver consoles, 62 fixed and mobile point-of-sale units, depot cashier and driver dispatching devices, and an integrated back office, depot management and administrative software solution. GABS has run scheduled bus services in Cape