Skip to main content

ABB to deliver fast charging solution to Denmark

Asea Brown Boveri (ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019. ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the
June 1, 2018 Read time: 1 min

Asea Brown Boveri (4540 ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019.

ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the bus to the charging point.

Additionally, four ABB HVC-Overnight Chargers will be installed at the bus depot. These chargers come with ABB Ability connected solutions to help network operators monitor and configure the charge points remotely.

For more information on companies in this article

Related Content

  • LA Metro takes delivery of first zero emission buses
    May 1, 2015
    Hot on the heels of the announcement of California Governor Jerry Brown’s Executive Order to reduce carbon dioxide (CO2) emissions in the state to 40 per cent below 1990 levels by 2030 comes the news that the Los Angeles Metropolitan Transportation Authority (LA Metro) has taken delivery of its first five battery electric transit buses. These 40-foot buses are built by local Southern California Electric Vehicle manufacturer BYD Motors and will be integrated into their daily operations, as the buses are
  • Microgrids & the new power generation
    August 31, 2021
    Public transportation agencies are turning to microgrids to provide critical resilience in the event of local and regional power interruptions. Gordon Feller looks at projects in Maryland, New Jersey and Massachusetts
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Phase 1 of New Zealand’s first fast-charging network goes live
    October 28, 2015
    The first Veefil fast charger for electric vehicles (EV) to be installed in New Zealand, designed and manufactured by Australian company Tritium, will be operational for public use from 30 October. Located in the town of Kaiwaka, situated between Auckland and Northland, this represents the launch of Phase 1 of a three-year project by ChargeNet to create the country’s first fast-charging network. Installed in the car parking area of a supermarket, the Veefil represents the start of a long-held vision by