Skip to main content

ABB adds AC Wallboxes to portfolio of charging solutions

ABB has added alternative current (AC) Wallboxes to its portfolio of charging solutions. The systems can be installed in homes and businesses and are said to be ideally suited for companies that want to provide overnight charging facilities for clients that work in sectors such as hospitality. The products are manufactured with a robust all-weather enclosure for indoor and outdoor use and are available in different versions, offering 4.6 and 11 kW AC charging as well as 22 kW AC 3-phase charging. The
March 23, 2018 Read time: 2 mins

4540 ABB has added alternative current (AC) Wallboxes to its portfolio of charging solutions. The systems can be installed in homes and businesses and are said to be ideally suited for companies that want to provide overnight charging facilities for clients that work in sectors such as hospitality.

The products are manufactured with a robust all-weather enclosure for indoor and outdoor use and are available in different versions, offering 4.6 and 11 kW AC charging as well as 22 kW AC 3-phase charging. The chargers are fitted and maintained via ABB’s global technical support services.

A range of connector types including type two socket, type two socket with shutter and type one and type two cable are integrated into the Wallboxes with the intention of improving flexibility. For locations where wall mounting is difficult, a variety of pedestals are available including one charger, two chargers back to back or two chargers in a 90-degree angle. The systems can also come with or without an energy meter, load balancing, back office integration and UMTS/3G modem.

For more information on companies in this article

Related Content

  • European eCoMove consortium presents findings
    November 20, 2013
    After three years of research, the Cooperative Mobility Systems and Services for Energy Efficiency (eCoMove) consortium has presented its final results to the public. The consortium, comprising 32 partners including public authorities, vehicle manufacturers, service providers, infrastructure and telecommunication operators, and research institutes, has developed solutions using next-generation vehicle-to-X communication technologies to reduce the inefficiencies responsible for energy waste in road trans
  • Additional functionality gives loops a continued lease of life
    March 20, 2014
    Two decades after the death of the inductive loops was predicted, Matt Zinn, technical services manager at Eberle Design says the technology still offers advantages. More than 20 years ago the emergence of video detection systems led many to foretell the end of inductive loops. In the intervening years advocates of radar, infrared and wireless detection technologies have also claimed that loops were on their way out. But in fact, by all calculations, the use of loops has actually increased and although
  • Mature solutions for emerging economies
    June 8, 2015
    Siemens’ Marcus Welz talks to David Crawford about suitable ITS solutions for emerging economies. Be bold in vision - and output - and user-oriented in practice,” Marcus Welz advises emerging economies planning ITS investments. Says the Siemens Group senior vice president and global sales director for ITS: “Their road users need better, more reliable and safer trips – but without costs increasing too much. The good news is that many countries are already tackling the big issues of traffic and the environmen
  • C-ITS in the EU: ‘A little tribal’
    April 1, 2019
    As the C-ITS Delegated Act begins its journey through the European policy maze, Adam Hill looks at who is expecting what from this proposed framework for connected vehicles – and why some people are insisting that the lawmakers are already getting things wrong here are furrowed brows in Brussels and Strasbourg as European Union legislators begin to consider the rules which will underpin future services such as connected vehicles. The idea is to create a regulatory framework to harmonise cooperative ITS