Skip to main content

ABB adds AC Wallboxes to portfolio of charging solutions

ABB has added alternative current (AC) Wallboxes to its portfolio of charging solutions. The systems can be installed in homes and businesses and are said to be ideally suited for companies that want to provide overnight charging facilities for clients that work in sectors such as hospitality. The products are manufactured with a robust all-weather enclosure for indoor and outdoor use and are available in different versions, offering 4.6 and 11 kW AC charging as well as 22 kW AC 3-phase charging. The
March 23, 2018 Read time: 2 mins

4540 ABB has added alternative current (AC) Wallboxes to its portfolio of charging solutions. The systems can be installed in homes and businesses and are said to be ideally suited for companies that want to provide overnight charging facilities for clients that work in sectors such as hospitality.

The products are manufactured with a robust all-weather enclosure for indoor and outdoor use and are available in different versions, offering 4.6 and 11 kW AC charging as well as 22 kW AC 3-phase charging. The chargers are fitted and maintained via ABB’s global technical support services.

A range of connector types including type two socket, type two socket with shutter and type one and type two cable are integrated into the Wallboxes with the intention of improving flexibility. For locations where wall mounting is difficult, a variety of pedestals are available including one charger, two chargers back to back or two chargers in a 90-degree angle. The systems can also come with or without an energy meter, load balancing, back office integration and UMTS/3G modem.

For more information on companies in this article

Related Content

  • Technology and finance shapes up to make MaaS happen
    June 7, 2017
    The technology and finance aspects needed for Mobility as a Service (MaaS) to become widely adopted are taking shape as Geoff Hadwick and Colin Sowman hear. Sampo Hietanen, CEO of MaaS Global and ‘father’ of MaaS, started his address to ITS International’s recent MaaS Market conference in London by saying: “All of the problems that can be solved by a company or group of companies have already been solved, and now we are left with the big ones such as housing, transport and health. He called MaaS the “Netfli
  • Towards pan-European electromobility services
    November 2, 2012
    Europe’s Green eMotion project has announced the test phase of a project that will demonstrate Europe-wide roaming in an interoperable electromobility system and will provide access to new added-value services. Green eMotion will also support the promotion of cross-sector ICT standards for interoperability of electric vehicle (EV) services. Green eMotion is a major EU funded electromobility project; one of its objectives is to develop an IT system that defines the interfaces needed for pan-European electro
  • UVS expands Lucidity traffic control room range
    November 8, 2024
    Relaunched portfolio includes new three-slot WBC30 controller
  • Dynamic Message Signs : Don’t replace, refurbish and upgrade
    August 12, 2015
    Refurbishing old dynamic message signs can save money and increase technical capabilities as David Crawford discovers. Evidence is growing on both sides of the Atlantic of the scope for retrofitting old or technically out-of-date dynamic message signs (DMS) with new electronic equipment, to save on the costs of installing full-scale replacements. In the last four months of 2014, a number of US states progressed programmes that achieved savings of more than US$1.75 million (€1.56million).