Skip to main content

780 SolarLite road studs deployed on UK motorway accident black spot

An unlit stretch of the M42 motorway in the UK, identified as an accident black spot area due to the lack of street lighting linked to increased accident rates, has seen the installation of 780 Astucia SolarLite road studs. The studs, along the carriageway of the M42 from junctions 1 to 3a, give drivers up to 900 metres visibility of the road layout ahead, which is up to ten times greater than would be possible from traditional retro-reflective ‘cats eye’ road studs. In addition, the existing two metre whi
July 11, 2012 Read time: 2 mins
RSSAn unlit stretch of the M42 motorway in the UK, identified as an accident black spot area due to the lack of street lighting linked to increased accident rates, has seen the installation of 780 1875 Astucia SolarLite road studs. The studs,  along the carriageway of the M42 from junctions 1 to 3a, give drivers up to 900 metres visibility of the road layout ahead, which is up to ten times greater than would be possible from traditional retro-reflective ‘cats eye’ road studs. In addition, the existing two metre white line gaps were upgraded into six metre lines with three metre gaps to provide clearer and more defined guidance for road users whilst navigating through the motorway.

6110 Amey, the managing agent contractor for the M42 Contract Area 9 Scheme, opted for Astucia’s SolarLite road studs as offering the ideal solution, providing superior delineation of the lanes through their use of light emitting diodes (LED), which automatically illuminate during the hours of darkness.

Astucia SolarLite road studs, from the Clearview Traffic Group, work intuitively by charging and activating from natural sunlight, offering a totally sustainable and cost-effective road safety solution.

For more information on companies in this article

Related Content

  • ITS awards for highways technology company
    October 31, 2014
    Two projects which highways technology company Rennicks says could set the blueprint for a fresh approach to road safety have sparked a double celebration for the company. It has landed the title of Road Marking Project of the Year at the recent Highways Magazine Excellence Awards for a ground-breaking scheme in Scotland using solar-powered active road stud technology. And the company also clinched an ITS Ireland ITS Excellence award after providing the largest solar-powered variable message signs for t
  • ‘Risky tailgating and speeding rife on UK motorways’
    May 22, 2014
    Six in ten UK drivers own up to risky tailgating (57 per cent) and a similar proportion break the limit by 10mph or more (60 per cent) on motorways and 70mph dual carriageways, with men by far the worst offenders, a survey by Brake and insurance company Direct Line reveals. Almost all drivers say they worry about other drivers tailgating on motorways: 95 per cent are at least occasionally concerned about vehicles too close behind them; more than four in ten (44 per cent) are concerned every, or most, tim
  • LeddarTech increases d-tec sensor range
    January 31, 2013
    LeddarTech, Canadian supplier of advanced 3D detection and tracking systems based on patented Leddar (Light Emitting Diode Detection and Ranging) technology, has launched the second generation of its d-tec 3D traffic sensor. Leddar d-tec emits non-visible light into the area of interest and measures the time taken for the light to reflect off of objects and return to the sensor. The second generation provides a range increase of 25 per cent for all d-tec products without comprising the accuracy and performa
  • UK government’s US$283 million road building boost for Bedfordshire
    March 4, 2016
    Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1