Skip to main content

$268m FTA grant for San Antonio rapid transit

Via Rapid Green Line is planned to be up and running by late 2027
By Adam Hill January 3, 2025 Read time: 2 mins
Remember the Alamo: corridor will connect Downtown with airport and Missions area (© F11photo | Dreamstime.com)

Via Metropolitan Transit - the transportation agency for San Antonio in Texas - has signed a $268 million grant agreement with the US Federal Transit Administration (FTA) to support the region’s first advanced rapid transit corridor.

Via Rapid Green Line, planned to be up and running by late 2027, will have dedicated lanes and synchronised traffic signals and is designed to improve transportation options along a 10-mile corridor.

Part of Via's Keep SA Moving plan, it will connect riders from the San Antonio International Airport, through Downtown, and south to the historic Missions area. Nearly 54,000 residents and 108,000 jobs are located along the route, and the FTA money represents the largest federal investment in Via’s history.

Benefits are set to include reduced travel times and enhanced rider experience, including off-board fare collection, level platform boarding and modern stations. 

The plan also includes upgrades to intersections, sidewalks and drainage, benefitting pedestrians, cyclists and motorists, Via says. 

The $268m grant was made available because the agency demonstrated it could provide high-quality transit services along dedicated bus-only lanes and secure local matching funds for construction and operation of the project: in 2020, 68% of San Antonio voters approved a measure to redirect an existing 1/8-cent sales tax to the transit agency, starting in 2026. 

FTA deputy administrator Veronica Vanterpool says: “Right now, many San Antonio households are spending nearly a quarter of their income just on transportation. This new transit line will help lessen that financial burden and create a thriving environment where everyone can enjoy greater mobility and economic opportunities.”

"Together with the FTA, we’re now fully funded to construct the backbone of a system designed to meet the mobility needs of San Antonio, well into our evolving future,” says Via president/CEO Jeffrey C. Arndt.

“The Via Rapid Green Line will help countless residents and visitors more easily navigate our city, removing obstacles and barriers to healthcare, workforce development, jobs and opportunity that may have previously been out of reach. We see a future in which our customers spend less time travelling and more time doing the things that matter most in their lives.”

Related Content

  • Politicisation of US transportation funding
    October 13, 2015
    Andrew Bardin Williams looks at how a political stalemate and a series of short-term fixes is undermining America’s highway funding and curtailing long-term planning. It was a week before the deadline to renew funding for the Highway Trust Fund, and the clock was ticking.
  • 7,000 TfL staff furloughed today
    April 27, 2020
    Transport for London (TfL)’s main source of income “has almost disappeared”.
  • US transit agencies unite in Covid-19 response
    September 22, 2020
    Industry is also calling for another $32bn in emergency funding to keep going
  • Siemens expands partnership with San Diego MTS
    November 3, 2016
    Siemens is to supply the San Diego Metropolitan Transit System (MTS) with 45 new S70 light rail vehicles (LRVs). The new vehicles will allow service enhancements on existing rail lines and provide the necessary LRVs to operate the 11-mile extension of the UC San Diego Blue Line that is now under construction. The low-floor LRVs will feature a redesigned middle section of the vehicle to improve passenger flow, including greater wheelchair accessibility and bicycle storage. MTS will use 36 of the 45 new L