Skip to main content

$268m FTA grant for San Antonio rapid transit

Via Rapid Green Line is planned to be up and running by late 2027
By Adam Hill January 3, 2025 Read time: 2 mins
Remember the Alamo: corridor will connect Downtown with airport and Missions area (© F11photo | Dreamstime.com)

Via Metropolitan Transit - the transportation agency for San Antonio in Texas - has signed a $268 million grant agreement with the US Federal Transit Administration (FTA) to support the region’s first advanced rapid transit corridor.

Via Rapid Green Line, planned to be up and running by late 2027, will have dedicated lanes and synchronised traffic signals and is designed to improve transportation options along a 10-mile corridor.

Part of Via's Keep SA Moving plan, it will connect riders from the San Antonio International Airport, through Downtown, and south to the historic Missions area. Nearly 54,000 residents and 108,000 jobs are located along the route, and the FTA money represents the largest federal investment in Via’s history.

Benefits are set to include reduced travel times and enhanced rider experience, including off-board fare collection, level platform boarding and modern stations. 

The plan also includes upgrades to intersections, sidewalks and drainage, benefitting pedestrians, cyclists and motorists, Via says. 

The $268m grant was made available because the agency demonstrated it could provide high-quality transit services along dedicated bus-only lanes and secure local matching funds for construction and operation of the project: in 2020, 68% of San Antonio voters approved a measure to redirect an existing 1/8-cent sales tax to the transit agency, starting in 2026. 

FTA deputy administrator Veronica Vanterpool says: “Right now, many San Antonio households are spending nearly a quarter of their income just on transportation. This new transit line will help lessen that financial burden and create a thriving environment where everyone can enjoy greater mobility and economic opportunities.”

"Together with the FTA, we’re now fully funded to construct the backbone of a system designed to meet the mobility needs of San Antonio, well into our evolving future,” says Via president/CEO Jeffrey C. Arndt.

“The Via Rapid Green Line will help countless residents and visitors more easily navigate our city, removing obstacles and barriers to healthcare, workforce development, jobs and opportunity that may have previously been out of reach. We see a future in which our customers spend less time travelling and more time doing the things that matter most in their lives.”

Related Content

  • Cubic wins contract from MTA to replace MetroCard with new fare payment system
    October 27, 2017
    Cubic Transportation Systems (CTS) has been chosen for a contract valued, $539.5 million (£409.4 million) with additional options worth $33.9 million (£25.7 million), by the New York Metropolitan Transportation Authority (MTA) to replace the MetroCard with a fare payment system similar to Transport for London (TfL). The new system is designed with the intention of providing an enhanced and integrated travel experience across the region including seamless access to Long Island Rail Road (LIRR) and Metro-Nort
  • Chicago integrates regional transit fares
    December 16, 2014
    Travellers in Chicago will soon be able to use a single app to plan their journey, pay and receive real-time alerts across all public transit services in the Chicago region. The Chicago Transit Authority (CTA), suburban bus operator Pace and commuter rail system Metra have awarded Cubic Transportation Systems a US$5.4 million contract to supply an integrated mobile application and system supporting a wide variety of mobile ticketing, mobile top up, contactless mobile payment using Near Field Communication (
  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa
  • Electrify to double EV charging network
    August 16, 2021
    Plans include an EV charging highway to the upper Midwest