Skip to main content

$268m FTA grant for San Antonio rapid transit

Via Rapid Green Line is planned to be up and running by late 2027
By Adam Hill January 3, 2025 Read time: 2 mins
Remember the Alamo: corridor will connect Downtown with airport and Missions area (© F11photo | Dreamstime.com)

Via Metropolitan Transit - the transportation agency for San Antonio in Texas - has signed a $268 million grant agreement with the US Federal Transit Administration (FTA) to support the region’s first advanced rapid transit corridor.

Via Rapid Green Line, planned to be up and running by late 2027, will have dedicated lanes and synchronised traffic signals and is designed to improve transportation options along a 10-mile corridor.

Part of Via's Keep SA Moving plan, it will connect riders from the San Antonio International Airport, through Downtown, and south to the historic Missions area. Nearly 54,000 residents and 108,000 jobs are located along the route, and the FTA money represents the largest federal investment in Via’s history.

Benefits are set to include reduced travel times and enhanced rider experience, including off-board fare collection, level platform boarding and modern stations. 

The plan also includes upgrades to intersections, sidewalks and drainage, benefitting pedestrians, cyclists and motorists, Via says. 

The $268m grant was made available because the agency demonstrated it could provide high-quality transit services along dedicated bus-only lanes and secure local matching funds for construction and operation of the project: in 2020, 68% of San Antonio voters approved a measure to redirect an existing 1/8-cent sales tax to the transit agency, starting in 2026. 

FTA deputy administrator Veronica Vanterpool says: “Right now, many San Antonio households are spending nearly a quarter of their income just on transportation. This new transit line will help lessen that financial burden and create a thriving environment where everyone can enjoy greater mobility and economic opportunities.”

"Together with the FTA, we’re now fully funded to construct the backbone of a system designed to meet the mobility needs of San Antonio, well into our evolving future,” says Via president/CEO Jeffrey C. Arndt.

“The Via Rapid Green Line will help countless residents and visitors more easily navigate our city, removing obstacles and barriers to healthcare, workforce development, jobs and opportunity that may have previously been out of reach. We see a future in which our customers spend less time travelling and more time doing the things that matter most in their lives.”

Related Content

  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • DART to launch corridor management system
    March 25, 2013
    Dallas Area Rapid Transit (DART) is to launch its corridor management system, which will integrate traffic information from the myriad transportation agencies along the north central expressway in the region to provide drivers with up to date travel information. The US$9 million project, partially funded by the Department of Transportation, is among several integrated corridor management pioneer sites chosen because of the high travel demand and congestion brought on by the more than 266,000 vehicles that u
  • USDoT offers $180m for Low-No programme 
    February 25, 2021
    Eligible applicants for emissions-reduction grants include transit agencies and DoTs
  • Federal grant to improve Nashville MTA
    September 9, 2013
    NASHVILLE’s Metro Transit Authority is to improve and expand the bus service into downtown Nashville, thanks to a US$10 million US Department of Transportation grant. The US$13.8 million project includes the installation of upgraded traffic signal equipment and safety enhancements that will improve bus service and provide a more comfortable ride for transit users.