Skip to main content

Mvis offers mobile variable warning signs to minimise road disruption

Mvis has launched two new variable message signs (VMS) to assist drivers with road closures, traffic accidents or planned maintenance work in the event of drivers needing to be re-routed. The signs are designed to be portable and mobile so that they can quickly be put into position with minimum disruption. For planned maintenance, messages can be scheduled at different times and dates using the Web Studio to warn motorists to make alternative plans. Changes can be made by any Wi-Fi-enabled Apple device for
February 9, 2018 Read time: 2 mins

Mvis has launched two new variable message signs (VMS) to assist drivers with road closures, traffic accidents or planned maintenance work in the event of drivers needing to be re-routed. The signs are designed to be portable and mobile so that they can quickly be put into position with minimum disruption.

For planned maintenance, messages can be scheduled at different times and dates using the Web Studio to warn motorists to make alternative plans. Changes can be made by any Wi-Fi-enabled Apple device for any quick changes that need to be made.

In unplanned incidents, MVIS’ distribution team will be able to deploy a VMS from any of its 20 depots quickly. In addition, a 24/7 support line is available for any assistance related queries.

MVIS supplies two different sized VMS products – the smaller of the two; the VMS-A is suitable for inner city and urban roads with a speed limit of 50mph or under, and the larger VMS-C which is suitable for all roads, especially motorways and locations with a speed limit of 60mph or more.

The equipment is completely weatherproof and vandal resistant. Its non-glare LED screen means your message will be completely visible at any time of the day or night.

Related Content

  • Connected cones make for safer sites
    May 31, 2013
    David Crawford welcomes new lives for old road safety products. Traffic cones and barrels have traditionally been on the bottom shelf of the road construction and maintenance industry, typically forming visible soft safety barriers for temporary works at a lower cost than concrete alternatives. On both sides of the Atlantic, however, they are fast gaining new roles as instrumented components in advanced construction safety arrays. The EC-sponsored €1 million (US$1.31 million) Safelane collaborative innovati
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Enforcement comes in many guises
    June 22, 2016
    Colin Sowman looks at some enforcement case studies from around the world. It is a sad fact of life that unenforced laws are not adhered to by a sometimes sizable proportion of the public and once enforcement is seen to be lacking, some drivers can take this to extremes and authorities must decide how to regain control.
  • When traffic data can get it totally wrong
    November 30, 2021
    How can a highway devoid of traffic provide data suggesting it is filled with vehicles crawling along? Michael Vardi of Valerann provides an insight into how data can easily be skewed - and what can be done to prevent it