Skip to main content

US commits $5bn to EV charging network 

Total available to states in National EV Infrastructure Formula Programme in 2022 is $615m
By Ben Spencer February 18, 2022 Read time: 2 mins
US Bipartisan Infrastructure Law is expected to provide the necessary infrastructure for drivers to travel from coast to coast (© Joaquin Corbalan | Dreamstime.com)

The US Departments of Transportation and Energy have confirmed nearly $5 billion will be made available to build out a national electric vehicle (EV) charging network. 

The new National Electric Vehicle Infrastructure Formula Programme – established by president Biden's Bipartisan Infrastructure Law – will provide the funding over five years to help US states create a network of EV charging stations along designated alternative fuel corridors.

The total amount available to US states in 2022 under the programme is $615m. A second grant programme to further increase EV charging access in locations throughout the country, including rural and underserved communities, will be announced later this year. 

US transportation secretary Pete Buttigieg says: “The president’s Bipartisan Infrastructure Law will help us win the EV race by working with states, labour, and the private sector to deploy a historic nationwide charging network that will make EV charging accessible for more Americans.”

US secretary of energy Jennifer M. Granholm says: “The Bipartisan Infrastructure Law is helping states to make electric vehicle charging more accessible by building the necessary infrastructure for drivers across America to save money and go the distance, from coast to coast.”

Each state is required to submit an EV Infrastructure Deployment Plan to the new Joint Office of Energy and Transportation that describes how it intends to use its share of programme funds consistent with Federal Highway Administration (FHWA) guidance.

The joint office will help implement the programme by providing direct technical assistance and support to help US states develop their plans before they are reviewed and approved by the FHWA, which administers the funding.

Additionally, the office has launched a new website so that officials can find links to technical assistance, data and tools for states and careers. 
 

For more information on companies in this article

Related Content

  • Gridserve unveils 'mass charging' EV forecourt
    December 11, 2020
    Company says it can charge 36 EVs at once, adding 200 miles of range in 20 minutes
  • Public charging service makes EV charging easier
    December 4, 2012
    A new public remote charging service launched in the US by electric vehicle (EV) charging company SemaConnect enables drivers to quickly charge their electric vehicles by simply logging on to SemaConnect with their smartphone. The service can be used 24/7 and does not require drivers to swipe a credit card. EV drivers can access the new feature when visiting a SemaConnect ChargePro station by visiting the SemaConnect website via their smartphone and selecting “start charging now.” They then enter the statio
  • DriveWyze wireless Preclear system speeds weighstation waiting
    March 1, 2013
    Drivewyze aims to revolutionise the way weighstation bypass systems work with its Pre-Clear system. And it’s not just looking at weighstations, either… Pete Goldin reports. Truck drivers know the drill: pull off the high­way at every weighstation and wait. Carriers know the drill, too: every minute spent waiting there translates directly into dollars lost. Traditionally, the only alternative to this scenario is a transponder-based system, which allows trucks to bypass the sites using technology similar to
  • FHWA developing 2015 infrastructure guidance for connected vehicles
    January 23, 2014
    The US Federal Highway Administration (FHWA) plans to issue deployment guidance on connected vehicles to transportation infrastructure owner/operators in 2015 and is seeking input on what would best support decision-making and deployments at the state and local level. The FHWA is specifically seeking input on the following: • What type of guidance is needed to best support the successful deployment of connected vehicle technologies? • What specific issues would you like to see addressed for plannin