Skip to main content

Swarco puts the DVSA in control with new prism sign installation

Five prism signs have been installed Swarco Traffic to manage traffic control approaching an Enforcement Checksite operated by the Driver & Vehicle Standards Agency (DVSA) on the M74 motorway in Scotland. The signs have been installed at strategic points along the M74 by Beattock Summit to guide heavy vehicles into the nearside lane and direct selected vehicles into the weighbridge and inspection area. The signs feature a combination of control solutions with urban traffic management and control (UTMC)
May 20, 2015 Read time: 2 mins
Five prism signs have been installed 129 Swarco Traffic to manage traffic control approaching an Enforcement Checksite operated by the Driver & Vehicle Standards Agency (DVSA) on the M74 motorway in Scotland. The signs have been installed at strategic points along the M74 by Beattock Summit to guide heavy vehicles into the nearside lane and direct selected vehicles into the weighbridge and inspection area.

The signs feature a combination of control solutions with urban traffic management and control (UTMC) and 503 Highways Agency Standard interfaces. This provides the DVSA with the ability to control, monitor and provide status reporting including prism status, power failure, heater failure, communications failure and local control override. The signs can also be operated directly from a police control point.

Additional controllers and temperature sensors can also be included, including a de-icing cycle which can be programmed to come into operation in temperatures below two degrees centigrade. The prisms are automatically rotated by approximately 10 degrees in a forward and reverse direction at pre-determined times, thus preventing the build up of ice across the prisms.

A particular innovation is the use of a sinusoidal drive: it starts with a high torque, increases its speed during the turning process, and then slows down at the end to ensure an exact prism alignment. The drive then locks the prisms to protect them from external influences such as wind.

Derek Williamson, head of Sales for Swarco Traffic, says that this innovative drive technology has multiple benefits: “Not only does it help prevent the signs from being frozen in position – a viable hazard given the location – but it also significantly reduces mechanical wear and tear and maximises the sign’s life cycle.”

The local DVSA contracts manager is pleased with the outcome: “The new prism sign installation has so far proven very reliable,” she says, “and we will also be working with Swarco in ensuring the ongoing service and maintenance of the systems installed on what is one of the busiest routes into Scotland.”

For more information on companies in this article

Related Content

  • New parking guidance system opened in Switzerland
    December 18, 2014
    Swarco Traffic Switzerland has implemented a new parking guidance system in the town of Zug in central Switzerland. The technical installation was carried out by the Business Unit Parking/E-mobility of Swarco Traffic Systems Gaggenau. The system connects the town’s 16 multi-storey and 2,500 parking spaces, while 29 dynamic signs inform drivers of currently available spaces. In addition, 18 static direction signs were also signs. Councillor Heinz Tännler, head of the Zug Construction Department, is ple
  • Teledyne Flir views AV safety through Prism
    June 30, 2022
    Software framework is aimed at automotive perception engineers integrating thermal cameras
  • Swarco launches new street-level signals for cycle lanes
    March 10, 2016
    Swarco Traffic has launched a range of highly reliable mini-signals for towns and cities looking to install street-level signals for bicycle lanes. The first signals are already being installed in the UK on new Cycle Superhighway routes. The signals use a bespoke LED technology with high light output, low energy consumption and virtually no maintenance.
  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.