Skip to main content

Swarco puts the DVSA in control with new prism sign installation

Five prism signs have been installed Swarco Traffic to manage traffic control approaching an Enforcement Checksite operated by the Driver & Vehicle Standards Agency (DVSA) on the M74 motorway in Scotland. The signs have been installed at strategic points along the M74 by Beattock Summit to guide heavy vehicles into the nearside lane and direct selected vehicles into the weighbridge and inspection area. The signs feature a combination of control solutions with urban traffic management and control (UTMC)
May 20, 2015 Read time: 2 mins
Five prism signs have been installed 129 Swarco Traffic to manage traffic control approaching an Enforcement Checksite operated by the Driver & Vehicle Standards Agency (DVSA) on the M74 motorway in Scotland. The signs have been installed at strategic points along the M74 by Beattock Summit to guide heavy vehicles into the nearside lane and direct selected vehicles into the weighbridge and inspection area.

The signs feature a combination of control solutions with urban traffic management and control (UTMC) and 503 Highways Agency Standard interfaces. This provides the DVSA with the ability to control, monitor and provide status reporting including prism status, power failure, heater failure, communications failure and local control override. The signs can also be operated directly from a police control point.

Additional controllers and temperature sensors can also be included, including a de-icing cycle which can be programmed to come into operation in temperatures below two degrees centigrade. The prisms are automatically rotated by approximately 10 degrees in a forward and reverse direction at pre-determined times, thus preventing the build up of ice across the prisms.

A particular innovation is the use of a sinusoidal drive: it starts with a high torque, increases its speed during the turning process, and then slows down at the end to ensure an exact prism alignment. The drive then locks the prisms to protect them from external influences such as wind.

Derek Williamson, head of Sales for Swarco Traffic, says that this innovative drive technology has multiple benefits: “Not only does it help prevent the signs from being frozen in position – a viable hazard given the location – but it also significantly reduces mechanical wear and tear and maximises the sign’s life cycle.”

The local DVSA contracts manager is pleased with the outcome: “The new prism sign installation has so far proven very reliable,” she says, “and we will also be working with Swarco in ensuring the ongoing service and maintenance of the systems installed on what is one of the busiest routes into Scotland.”

Related Content

  • November 9, 2017
    Mobinet counters weighty cross border concerns
    A Mobinet pilot is combining onboard weighing with V2X comms to streamline vehicle weight enforcement. David Crawford reports. Pan-European, cross-border weigh-in-motion (WIM) for trucks is now a practical possibility, following successful Scandinavian trials within the EU-co-funded Mobinet (Internet of Mobility) programme. New technology is using strain sensors, located on load-bearing components and routinely installed in truck fleet management systems.
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • May 12, 2015
    Swarco launches new fully programmable VMS
    Swarco Traffic’s new, fully programmable variable message sign (VMS) delivers exceptional levels of clarity, durability and life-expectancy, says the company. An evolution of its proven 3G optic, the new version is available with 3G6 or 3G7 optic and is a full colour RGB matrix sign featuring significantly reduced power consumption for longer-life operation and further improved reliability.
  • February 25, 2015
    Substantial savings from smarter street lighting
    As authorities strive to reduce expenditure and carbon emissions, Colin Sowman looks at some of the smart ways of managing street lighting while containing costs and maintaining safety. Street lighting can account for 40% of an authority’s energy consumption. So, faced with the need to reduce outgoings, some authorities are looking for smart ways of managing street lighting or even turning off swathes of street lights in the small hours. Back in 2008 the E-street Initiative report concluded that authorities