Skip to main content

SESA deploys dynamic Trailblazer signs for Michigan DOT

SES America (SESA) recently completed the manufacture and installation of full colour LED dynamic Trailblazer signs for the Michigan Department of Transportation and is set to soon begin manufacturing of additional signs for the next phase of this ongoing work. The signs are part of integrated corridor management along I-75 designed by the Michigan Department of Transportation. Each sign is part of SESA’s Messenger 5000 embedded DMS series, a line of embedded DMS designed to display travel time, toll rate,
May 6, 2016 Read time: 2 mins

7846 SES America (SESA) recently completed the manufacture and installation of full colour LED dynamic Trailblazer signs for the Michigan Department of Transportation and is set to soon begin manufacturing of additional signs for the next phase of this ongoing work.

The signs are part of integrated corridor management along I-75 designed by the Michigan Department of Transportation. Each sign is part of SESA’s Messenger 5000 embedded DMS series, a line of embedded DMS designed to display travel time, toll rate, lane status or traffic control information.

As part of this project, the embedded DMS is intended to divert and manage the influx of traffic, and reduce traffic queues and congestion on freeways for both Macomber and Oakland counties. The signs feature a full colour display capable of showing a variety of arrows that re-direct traffic as necessary on to surface roads and alternate routes. The signs are controlled by SESA’s state-of-the-art NTCIP-compliant SCU6 controller housed in field cabinets near each site. Each sign is placed at strategic locations and display the indicative arrow only when needed.

According to SESA, this combination of static sign and embedded dynamic display is cost effective, advantageously replacing an entire full colour/full matrix DMS.

For the first deployment, energy-efficient technology was utilised to minimize the quantity and size of command, control, and power components, enabling the components to be installed in a small NEMA 4X cabinet attached to each sign structure for the initial deployment. This design was refined for the subsequent deployment, allowing all components to be installed within the sign itself, while maintaining the slim sign housing design required for the project.

Related Content

  • Sign language reduces human error says Clearview
    September 26, 2019
    Wrong-way warning systems and advanced queue detection can help to reduce human error. They can also cut road accidents – and therefore road deaths, says Clearview Intelligence Where were nearly 1,800 deaths on the UK’s roads in 2018 – an average of five people dying each day. The largest single cause of serious injury is crashes at junctions (accounting for 33% of incidents), while the largest single cause of death was run-off road crashes (30%) “With vehicles increasingly being designed with saf
  • Daktronics to focus on traffic management centres
    August 23, 2022
    Daktronics, a world leader in digital display technology with more than 30 years of experience in the ITS market worldwide, will highlight a different side of the company at the ITS World Congress. 
  • WSP/Parsons Brinckerhoff to design ITS infrastructure for Michigan University Region
    April 28, 2017
    The Michigan Department of Transportation (MDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the next phase of intelligent transportation system (ITS) deployment for the state’s University Region. The project will plan, design and construct new CCTV cameras, dynamic message signs and vehicle detection systems across the University Region to improve incident response and information dissemination to motorists on the state’s freeway system. WSP/Parsons Brinckerhoff will provide ITS design ser
  • Wireless technology aids workzone communications
    June 7, 2012
    Need for a temporary communication fix during a construction project has led to rapid deployment of a permanent but simplistic wireless broadband network in Chandler, Arizona When a major construction project was expected to disrupt highway communications in the city of Chandler, Arizona, the city’s engineers went looking for a simple solution. They needed a way of maintaining data connections with three consecutive intersections along Arizona Avenue in Chandler while construction necessitated the severin