Skip to main content

Schneider Electric aids New Hampshire DOT winter weather forecasts

Schneider Electric partnered with the New Hampshire Department of Transportation (NHDOT) during the 2013-2014 winter season as part of the Certified Public Manager (CPM) Program. The five-month partnership revealed precipitation forecasts from Schneider Electric to be more accurate in start and end times than a second weather/pavement forecasting service utilised by NHDOT. Schneider Electric created and customised a system to provide NHDOT with the most accurate precipitation forecasts, which are key to
August 20, 2014 Read time: 2 mins

729 Schneider Electric partnered with the 7053 New Hampshire Department of Transportation (NHDOT) during the 2013-2014 winter season as part of the Certified Public Manager (CPM) Program. The five-month partnership revealed precipitation forecasts from Schneider Electric to be more accurate in start and end times than a second weather/pavement forecasting service utilised by NHDOT.

Schneider Electric created and customised a system to provide NHDOT with the most accurate precipitation forecasts, which are key to timely treatments of roads.            

The accuracy of precipitation forecasts supported productivity of winter road maintenance operations for the NHDOT, enabling it to pretreat, treat and plough roads throughout storm cycles.
 
In order to provide a segmented forecast for the CPM Project, program managers chose to analyse two specific route segments along the I-93 corridor. Installed by Lufft USA, road weather information systems (RWIS) stations at each end of the corridor provided critical weather and pavement information that formed the basis for each forecast.

NHDOT’s RWIS data provided the hourly and daily weather and pavement forecasts, which were used by NHDOT staff during pre-storm preparation and in-storm operations to better determine what, if any, road treatments were required before, during and after each storm.

Schneider Electric also provided meteorological experts on a 24/7 basis for consultation, enabling the project to use real-time road and weather forecast data from Schneider Electric, automated storm warnings from RWIS and targeted alerts to improve the consistency and effectiveness of winter road maintenance services at NHDOT.

"The services provided by Schneider Electric played a pivotal role in our CPM Project. We were pleased with the results and grateful for their assistance,” Nicholas King, NHDOT CPM Project 2014 team leader.

For more information on companies in this article

Related Content

  • Road space utilisation improves travel times, reduces costs
    February 1, 2012
    For major road works schemes, necessary lane closures are timed to minimise congestion, most frequently at night and on weekends when traffic is at its lightest. As a result, rigid timetables are used in planning, programming and implementing work. In the UK, to calculate the expected traffic demand through roads works, historic profiles from the loop-based MIDAS (Motorway Incident Detection Automatic Signalling) system were used. These provided a valuable indicator of anticipated traffic behaviour but were
  • System predicts train delays and informs response
    February 25, 2016
    David Crawford looks into the near-term future for Stockholm’s rail commuters. Swedish rail operator Stockholmståg, which runs commuter services in and around the country’s capital, is claiming a world first with the introduction of its automated Pendelprognosen (commuter prognosis) service. Developed to enable the prediction of delays as much as two hours before they are likely to occur, this offers the operator the scope for much earlier remedial action than previously - for example by filling in the expe
  • SmartCity US example from Schneider Electric
    April 22, 2013
    In less than 40 years, 70 per cent of the world’s populations will live and breathe in our cities, pushing the world’s cities to their breaking point due to the rapid growth. The question is, can this growth be constructed in a sustainable way? Can the carbon footprint and overall environmental impact be reduced along the way
  • ITS homes in on cycling safety
    April 9, 2014
    A new generation of ITS equipment is helping road authorities get to grips with cycle safety – and not a moment too soon as Colin Sowman discovers. Cyclists - remember them? Apparently not. At least not according to the OECD 2013 report Cycling, Health and Safety which contains the statement: ‘Cyclists are often forgotten in the design of the road traffic system’. Looking through the statistics that exist (each country appears to compile them differently) it is not difficult to see how such a conclusion cou