Skip to main content

Schneider Electric aids New Hampshire DOT winter weather forecasts

Schneider Electric partnered with the New Hampshire Department of Transportation (NHDOT) during the 2013-2014 winter season as part of the Certified Public Manager (CPM) Program. The five-month partnership revealed precipitation forecasts from Schneider Electric to be more accurate in start and end times than a second weather/pavement forecasting service utilised by NHDOT. Schneider Electric created and customised a system to provide NHDOT with the most accurate precipitation forecasts, which are key to
August 20, 2014 Read time: 2 mins

729 Schneider Electric partnered with the 7053 New Hampshire Department of Transportation (NHDOT) during the 2013-2014 winter season as part of the Certified Public Manager (CPM) Program. The five-month partnership revealed precipitation forecasts from Schneider Electric to be more accurate in start and end times than a second weather/pavement forecasting service utilised by NHDOT.

Schneider Electric created and customised a system to provide NHDOT with the most accurate precipitation forecasts, which are key to timely treatments of roads.            

The accuracy of precipitation forecasts supported productivity of winter road maintenance operations for the NHDOT, enabling it to pretreat, treat and plough roads throughout storm cycles.
 
In order to provide a segmented forecast for the CPM Project, program managers chose to analyse two specific route segments along the I-93 corridor. Installed by Lufft USA, road weather information systems (RWIS) stations at each end of the corridor provided critical weather and pavement information that formed the basis for each forecast.

NHDOT’s RWIS data provided the hourly and daily weather and pavement forecasts, which were used by NHDOT staff during pre-storm preparation and in-storm operations to better determine what, if any, road treatments were required before, during and after each storm.

Schneider Electric also provided meteorological experts on a 24/7 basis for consultation, enabling the project to use real-time road and weather forecast data from Schneider Electric, automated storm warnings from RWIS and targeted alerts to improve the consistency and effectiveness of winter road maintenance services at NHDOT.

"The services provided by Schneider Electric played a pivotal role in our CPM Project. We were pleased with the results and grateful for their assistance,” Nicholas King, NHDOT CPM Project 2014 team leader.

For more information on companies in this article

Related Content

  • AWS finds new solutions
    December 8, 2021
    Forward-thinking public agencies are turning to a new breed of solutions provider to address current traveller needs. They work with system integrators, independent software vendors, and consultants to innovate using Amazon Web Services (AWS) to improve traffic safety, construction project management, analytics and reporting, and secure identification. Phil Silver, a state and local government transportation leader at AWS, provides examples of how builders on AWS are transforming transport using technology
  • ITS initiatives provide travel information for disabled passengers
    December 4, 2012
    David Crawford investigates initiatives and issues in travel information for disabled passengers. World Health Organisation estimates suggest that 10% of the global population live with a disability. This can impact directly on their mobility, with implications for their independence; keeping active; and travelling to work, education and social activities; as well as the accessibility of information necessary to aid mobility. The EU-supported ‘CARDIAC’ project (Coordination Action in R&D in Accessible & Ass
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • Ouster Lidar aids German V2X plans 
    November 3, 2021
    Researchers built 60 mobile measuring stations to be deployed across a 4.3km stretch