Skip to main content

McCain VMS for PennDoT I-76 smart corridor near Philadelphia

McCain’s variable speed limit signs have been chosen for the new Interstate 76 (Schuylkill Expressway) smart corridor initiatives. The Swarco Group subsidiary says the deal with Pennsylvania Department of Transportation (PennDoT) is one of its largest variable messaging signs (VMS) deployments on the US east coast. McCain distributor M.H. Corbin has been awarded the contract for 76 signs to be installed over the next year along nearly 50 miles of the I-76 between King of Prussia and Philadelphia – a majo
November 15, 2018 Read time: 2 mins
772 McCain’s variable speed limit signs have been chosen for the new Interstate 76 (Schuylkill Expressway) smart corridor initiatives.


The 129 Swarco Group subsidiary says the deal with 6111 Pennsylvania Department of Transportation (PennDoT) is one of its largest variable messaging signs (VMS) deployments on the US east coast.

McCain distributor M.H. Corbin has been awarded the contract for 76 signs to be installed over the next year along nearly 50 miles of the I-76 between King of Prussia and Philadelphia – a major commuter route to the city and surrounding areas.

"This is a major contract and these signs will have a profound and immediate impact on I-76," said Randy Bobo, McCain VMS sales manager. “Frequent travellers along the route are accustomed to congestion but we believe these signs will help traffic managers reduce the frequency and duration of slow-downs as our equipment comes online."

McCain says the new signs mean traffic managers can reduce or increase speed limits to better maintain traffic flow and safety in conditions including heavy traffic, bad weather and accidents.

Deployments of variable speed limits in other areas have been shown to reduce crashes by as much as 30%, the company adds.

For more information on companies in this article

Related Content

  • Swarco to present new innovations at Road Expo Scotland 2017
    October 18, 2017
    Swarco will showcase two new innovations, Profectus and Zephyr, at Road Expo Scotland that are designed with the intention of providing local authorities with control of school warning signs and control over traffic assets and strategy. Profectus is a central processing board that allows school signs and vehicle activated signs to be monitored and programmed to make the surrounding area safe during term time.
  • US ITS sector needs strategic leadership
    January 31, 2012
    The US is losing its advantage in the ITS sector because of a lack of strategic leadership, according to a new report from the Information Technology and Innovation Foundation. Here, Stephen Ezell, one of the report's authors, talks to ITS International about what can be done to remedy the situation. A new report from the Information Technology and Innovation Foundation (ITIF), Explaining International IT Leadership: Intelligent Transportation Systems, makes for sobering reading within the US ITS community.
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • MVIS VMS solution deployed on Highways England’s road upgrade project
    September 4, 2017
    Mobile Visual Information Systems (MVIS) has implemented its DATEX journey time solution (JTS) on Highway’s England’s US$1.9 billion (£1.5billion) A14 Cambridge to Huntingdon upgrade scheme, enabling an average of 85,000 drivers daily who use the 21 mile stretch of road to navigate the roadworks. The project incorporates 26 Bartco UK VMS-Cs variable message signs which display journey times from their locations to the end of the affected stretch of road