Skip to main content

Gewi’s software aids Austrian winter road reporting

Austria’s Federal State of Niederösterreich has been successfully using Gewi’s TIC software solution to create and distribute information on winter road conditions and work zones for the state’s14,000 kilometre road network. During the winter season, each of the fifty-eight road maintenance departments reports current road conditions in their district to the TIC system, which creates an overview report on which districts have snowfall, road conditions, the highest/lowest temperature, snow chain requirements
February 14, 2013 Read time: 2 mins
Austria’s Federal State of Niederösterreich has been successfully using 1862 Gewi’s TIC software solution to create and distribute information on winter road conditions and work zones for the state’s14,000 kilometre road network.

During the winter season, each of the fifty-eight road maintenance departments reports current road conditions in their district to the TIC system, which creates an overview report on which districts have snowfall, road conditions, the highest/lowest temperature, snow chain requirements, etc.  The data is exported in MS Word format, including a map showing all districts and their information.

The information is referenced to a network and automatically distributed to customers such as traffic information centres. Historical data is exported into a file which is used to create statistics using third party tools to analyse data each month.

During the construction season, TIC is also used to create and distribute information about work zones, managing the complex information structure of work zones, including data on individual work phases, including traffic and duration of delays; network location, diversions, lanes, maximum height and maximum weight.

Work zone information is also automatically distributed to customers such as traffic information centres, and, as with winter road conditions, historical data is exported into a file which is used to create statistics using third party tools to analyse data each month.

According to Gewi, its TIC software product features a modular architecture which helps organisations quickly and cost-effectively establish their own systems.  The latest generation of the software provides the flexibility to easily collect, store and distribute virtually any type of data, and exchange and harmonise data between a wide range of systems.

Related Content

  • October 10, 2012
    Integrated weather and traffic data aids winter maintenance
    A US pooled fund study group has developed a system of software aimed at taking the concept of winter maintenance decision support to a new level – a scientific ‘one-stop-shop’ of weather and service performance data. This report is by Charles Chambers and Benjamin Hershey. With advancements in environmental technology come new systems that assist agencies with better management of winter roadway maintenance resources. In the late 1990s the US Federal Highway Administration (FHWA) began work developing a pr
  • April 6, 2018
    The importance of going with the flow
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • August 5, 2016
    Hartford’s tailors winter maintenance on Esri’s GIS platform
    The in-house winter maintenance and vehicle tracking system built by the Public Works Department in Hartford, Connecticut, coped with record snowfalls and cut costs too. When it comes to dealing with the effects of mother nature, transport agencies can find themselves in a lose-lose situation: criticised if the roads or rail lines are disrupted by snow, ice or floods for more than a few hours and lambasted for wasting money if the equipment and stockpiles put in place for a hard winter remain unused.
  • September 21, 2022
    No summertime blues for Gewi
    Canada’s Quebec City, with a population of round 550,000, has a specific challenge when it comes to building new roads and maintaining existing ones. Harsh winter weather means roadworks have a short window of opportunity – April to October at best. During these summer months there can be upwards of 2,000 sets of roadworks, causing major traffic snarls.