Skip to main content

Creepy robots direct Japan’s work zone traffic

Driving through a road construction zone usually involves obeying flashing signs or traffic signals. Japan has another answer to moving motorists through a road construction zone –battery powered robots. Called Anzen Taro, which roughly translates to ‘Safety Sam’, the dead-eyed entities range from electronic cartoons to crude scarecrows and disembodied torsos and are used to control traffic around government-funded construction sites in Japan. Their complexity varies from a simple metal plate to clothed
January 29, 2014 Read time: 1 min
Driving through a road construction zone usually involves obeying flashing signs or traffic signals.  Japan has another answer to moving motorists through a road construction zone –battery powered robots.

Called Anzen Taro, which roughly translates to ‘Safety Sam’, the dead-eyed entities range from electronic cartoons to crude scarecrows and disembodied torsos and are used to control traffic around government-funded construction sites in Japan. Their complexity varies from a simple metal plate to clothed mannequins, all with a robotic arm to direct traffic.

Related Content

  • How ITS helped Coachella get its groove back
    November 15, 2024
    California’s Coachella Valley attracts visitors to myriad music and sports events. But now an ambitious traffic management initiative aims to cut travel times and reduce emissions. Adam Hill talks to the engineers involved in the massive CV Sync project
  • Greenowl brings bespoke traveller information one step closer
    June 4, 2015
    Greenowl’s voice-only congestion warning smartphone app alerts drivers to problems ahead and could be the way ahead for traffic information. If there is one point Matt Man, CEO of Canadian company Greenowl, wants to make clear from the start, it is that his company’s app is not a navigation system. He says: “Our system does not direct drivers to their destination because we mainly focus on commuters who know how to get to where they are going and only need information about any delays and incidents ahead of
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Pictograms re-imagine traffic light design 
    August 24, 2021
    Art. Lebedev Studio light can come with a 5G module and sensors to monitor air quality