Skip to main content

Connected Kerb in NYC EV project

UK firm will be part of NYCDoT's DOT Studio initiative to drive up EV ownership
By Adam Hill August 5, 2022 Read time: 2 mins
The Biden Administration is targeting 50% of all new vehicle sales to be electric across the US by 2030 (© Su Wei | Dreamstime.com)

Electric vehicle (EV) infrastructure specialist Connected Kerb has been selected to deliver on-street EV chargers for a project in New York City.

The UK firm has been chosen by New York City Department of Transportation (NYCDoT) and Newlab for their collaboration - The DOT Studio initiative - which aims to demonstrate how public access to EV charging can drive up EV ownership amongst the 50% of city residents who park their cars on-street.

The Biden Administration is targeting 50% of all new vehicle sales to be electric across the US by 2030.

EV ownership in New York is growing: in 2021, around 15,000 EVs were registered in the city, with over 5,000 of these sold in 2020 alone.
 
From this autumn, Connected Kerb will install its EV charging points to deliver a ‘living lab’ that will demonstrate its smart city infrastructure.

Locations in Brooklyn Navy Yard are currently being scouted. Connected Kerb's charger infrastructure is often integrated into street furniture such as bollards, and can be integrated with other smart technologies, such as 5G, Internet of Things and air quality sensors.
 
The company says the power infrastructure of its chargers is installed below ground, offering a longer lifespan by protecting critical infrastructure, and enabling more plug sockets to be added above ground as demand grows in future.
 
The findings from the pilot are expected to inform wider EV charging roll-outs across New York City, helping to realise the city's goal of installing 10,000 curbside chargers by 2030, and electrifying 20% of municipal parking bays by 2025.
 
“There are around two million light duty vehicles in New York City, accounting for 80% of transport emissions," said Steve Richardson and Nick Dobie, Connected Kerb co-founders, in a statement.

"NYCDoT has established ambitious goals to eliminate these emissions by boosting electric vehicle adoption, and The DOT Studio project will provide crucial a blueprint for how to deliver world-leading charging infrastructure to support that goal – supercharging EV uptake, cutting emissions and improving public health."
 
Connected Kerb has selected Charge Infrastructure, a division of Charge Enterprises, to be installation provider for this project. 
 
“Enabling greater EV adoption is critical to achieving New York City’s Net Zero goals,” said Shaina Horowitz, VP of product and programs at Newlab.

“We expect the pilot to provide invaluable data on how to most effectively deploy EV charging infrastructure in densely populated areas and make scalable EV use possible, with potential implications for both NYC and cities around the world.” 
 
Three chargepoint providers – Connected Kerb, Char.gy and Voltpost – are participating in the project.

For more information on companies in this article

Related Content

  • EU offers vision of mobility
    March 26, 2021
    Major changes are in the air for ITS in Europe: José Diez of ERF considers what the European Commission’s newly-released policy strategy for sustainable and smart mobility will mean
  • Siemens to provide EV charging for Virginia commuter park and ride facility
    May 21, 2012
    Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
  • eVolt chargepoints support new fleet of EVs at Taxi Central
    February 7, 2017
    Electric vehicle chargepoint supplier eVolt has completed the installation of three rapid chargers for a Scottish taxi business to support its five new private hire Nissan Leaf EVs, which are now fully operational. Kirkcaldy-based Taxi Central has installed one of eVolt’s, which can charge the 30kWh Nissan Leafs to 80% battery life in 30 minutes, to provide on-shift EVs with essential charging capability; and two eVolt AC 7kW Wall-mount Chargers that fully charge the EVs in around 5 hours. The funding
  • Cost effective EV fast charger from ABB
    March 27, 2013
    US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour. Easy