Skip to main content

38,000 EV chargers coming to California 

200 EV ports are available at the Los Angeles County Fair
By Ben Spencer August 4, 2021 Read time: 2 mins
SCE has helped Long Beach install 102 EV ports (© Mykola Pokhodzhay | Dreamstime.com)

Southern California Edison (SCE) is to deploy 38,000 electric vehicle (EV) chargers over the next five years as part of a $436 million programme. 

Carter Prescott, SCE director of eMobility and building electrification, says: “As SCE is preparing its electric grid to serve the increase in transportation electrification, more charging equipment is needed to give EV drivers and fleet operators the peace of mind that they will be able to charge whenever they want. Today, we are asking our customers to join with us to ensure that an effective framework is in place for a clean air future for our communities.”

SCE says its Charge Ready programme allowed it to help non-profit organisation Fairplex install 200 EV ports at the 487-acre site that hosts the Los Angeles County Fair and 400 other events throughout the year.

Fairplex interim CEO Walter Marquez says: “Being an early adopter, we are now actually able to help others who are contemplating expanding their infrastructure through Charge Ready, and we appreciate that partnership with SCE. We know that electric vehicles and charging are very much a part of what California is going to be in the future and where it’s headed now.”

Additionally, SCE has helped the city of Long Beach install 102 EV ports at five sites, including the Aquarium of the Pacific, The Pike Outlets, City Place, the city’s fleet services yard and the Long Beach Police Academy.

April Walker, project management officer with the city, says: “The best part of participating in Charge Ready is being able to provide a benefit to both our public and our fleet. Transitioning fleet vehicles to zero-emission and electric is a benefit because you’re reducing the emissions that go right back into these communities.”

SCE is to continue providing charging infrastructure at workplaces, public car parks, schools, hospitals and destination centres, with an added emphasis on apartment complexes.

For more information on companies in this article

Related Content

  • Feature Test Nt
    July 31, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014.
  • Spanish city to test 200 EVs
    May 9, 2013
    The Spanish city of Malaga is to participate in the four-year Zem2All project to study the impact that the use of electric vehicles (EVs) have on the city. During the tests an in-depth study of the impact of EVs on the electricity grid will be carried out and the conditions for a widespread use of electric cars will be analysed. Researchers say results should provide information on the impact and management of e-mobility resources in cities of the future, ranging from the use of cars, charging infrastructur
  • Transit and Curb expand taxi integration 
    September 30, 2021
    Users can now access Curb rides in Chicago, Philadelphia and Washington, DC
  • California to get electric bus assembly plant
    April 3, 2013
    Chinese electric vehicle (EV) producer BYD is to build an assembly plan in Lancaster, about seventy miles north of Los Angeles, to make electric buses for US and Latin American public transportation markets. The facility will be one of only a few making electric buses in the US, where most buses use diesel fuel or compressed natural gas. Michael Austin, vice president of BYD America, said Lancaster's aggressive embrace of solar energy programs was a factor in deciding to build the plant there. "They've been