Skip to main content

UK port installs Swarco traffic management

FM Conway, the main contractor for the traffic management improvement scheme at the Port of Dover, has awarded Swarco the contract to install 15 variable message signs as part of a US$123 million (£85 million) capital investment programme to better manage and control vehicles through a new freight holding facility to remove more than 4km of queuing traffic from Kent’s highways. Two signs are used to direct heavy goods vehicles (HGVs) into Customs or the holding facility, depending on the quantity of tra
May 18, 2016 Read time: 2 mins
FM Conway, the main contractor for the traffic management improvement scheme at the Port of Dover, has awarded 129 Swarco the contract to install 15 variable message signs as part of a US$123 million (£85 million) capital investment programme to better manage and control vehicles through a new freight holding facility to remove more than 4km of queuing traffic from Kent’s highways.

Two signs are used to direct heavy goods vehicles (HGVs) into Customs or the holding facility, depending on the quantity of traffic; the remainder are installed on a 57.5 metre-long gantry at the start of the holding facility, giving drivers clear information about which lane to enter.

The Port has created a 13-lane holding zone catering for 220 outbound HGVs, limiting the need for Dover Traffic Access Protocol, a ‘rolling road’ HGV queuing system on the A20, and greatly reducing traffic and delays in Dover itself.

The signs, which include over 160,000 individual LEDs, were required to meet the Port’s exacting light emission standards to cater for its 24/7 freight needs and reduce light pollution at night.

As a part of the contract, Swarco also installed its management software, giving the operator 12 settings for different scenarios; 65 traffic detection sensors with count in/out capability; and barriers, operated by a traffic light system, that mark the holding facility’s end.

For more information on companies in this article

Related Content

  • Dynamic Message Signs : Don’t replace, refurbish and upgrade
    August 12, 2015
    Refurbishing old dynamic message signs can save money and increase technical capabilities as David Crawford discovers. Evidence is growing on both sides of the Atlantic of the scope for retrofitting old or technically out-of-date dynamic message signs (DMS) with new electronic equipment, to save on the costs of installing full-scale replacements. In the last four months of 2014, a number of US states progressed programmes that achieved savings of more than US$1.75 million (€1.56million).
  • Imtech receives significant traffic technology orders
    January 15, 2013
    European technical services provider Royal Imtech (Imtech) has been awarded a series of contracts worth US$57.5 million to upgrade the current traffic infrastructure in Stockholm, Moscow, Dublin and Copenhagen, as well as providing the technical infrastructure in a double-deck tunnel in Maastricht, Holland. The company will implement a Motorway Traffic Management (MTM) system on the E18 motorway in Sweden, an important road link in the northern part of Stockholm, featuring two tunnels and used by 50,000 veh
  • Contracts awarded for London’s traffic signals upgrade
    July 18, 2014
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • ACE report: private sector and user-pay for English roads
    May 16, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to