Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

For more information on companies in this article

Related Content

  • ODOT implements weather-activated speed signs
    November 18, 2016
    Oregon Department of Transportation (ODOT) has implemented digital variable speed limit signs over a thirty-mile stretch of Interstate 84 between Baker City and La Grande, replacing the standard speed signs in that area. The new signs will use traffic, road, weather and visibility sensors to lower the legal speed limit when ice, snow, fog or a wreck ahead requires drivers to slow down. Along with identifying the current legal speed limit, the digital displays can also show the reason for a reduced speed,
  • Telensa lights up Hertfordshire
    November 27, 2014
    More than 12,600 street lights on Hertfordshire’s A-roads are being upgraded to LED lighting using Telensa’s PLANet street light central management system (CMS), which will allow the lights to be monitored from a central point. This will reduce inspection costs and make it easier to spot and repair any faults. The system will also allow lighting levels on the A-roads to be reduced during the night, rather than turning lights off completely. Once the new lights are installed, light levels will be reduced
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • ITS Australia 2025 Awards: the winners
    February 14, 2025
    CEO Susan Harris praises 'collaborative spirit' to deliver data-led solutions