Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

For more information on companies in this article

Related Content

  • Australians ‘open to a fairer, more sustainable road funding system’
    September 12, 2016
    Australia’s first real-world trial of road charging options has found that motorists are open to a different way of paying for the nation’s roads. Transurban chief executive officer Scott Charlton said the first stage of the Melbourne Road Usage Study suggested a user-pays system could work in Australia, providing fair, sustainable and flexible funding for the infrastructure. The 18-month study, led by Transurban and supported by independent research and technology specialists, looked at how people used
  • Iteris tech to manage traffic during I-405 upgrade
    August 3, 2020
    Safety is emphasised during California highway improvement work
  • Variable message signs continue to deliver travel information
    February 2, 2012
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution
  • US DOTs introduce measures to stop wrong-way driving
    March 28, 2018
    Wrong-way driving (WWD) is a remarkably innocuous term for incidents that all too often cause some of the worst accidents that emergency services have to deal with. Several US states are now taking steps to minimise the problem, as Alan Dron finds out. You’re driving down a highway at night when you see approaching headlights. You initially assume they are merely those of an oncoming car on the opposite carriageway. It’s only when they are within 200 yards or so that you realise that the other driver is in