Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

Related Content

  • ITS upgrade for George Washington Bridge
    June 29, 2015
    The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 millio0n project. The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • Michigan improves real time traffic information
    June 24, 2013
    Michigan’s Road Commission for Oakland County (RCOC) has revamped its online real-time traffic map, making the congestion-monitoring tool simpler, easier and faster to use. The changes allow users to see congestion levels on county roads across Oakland County, thanks to data provided by RCOC’s Faster and Safer Travel through Traffic Routing and Advanced Controls (Fast-Trac) adaptive traffic-signal system. Fast-Trac detects the volume of traffic moving in each direction at equipped intersections and uses th
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot