Skip to main content

SESA completes Phase 2 of Michigan DOT sign project

Dynamic LED sign manufacturer SES America (SESA) has completed the installation and commissioning of seven dynamic message signs (DMS) signs along part of I-75 in Michigan. The signs were installed by J. Ranck Electric as part of the second phase of a project with the Michigan Department of Transportation (MDOT) and utilised SESA’s unique Messenger 5000 embedded DMS technology to display toll rate, lane status, and traffic control information. This operation is the second phase of a collaboration betw
December 9, 2016 Read time: 2 mins
Dynamic LED sign manufacturer 7846 SES America (SESA) has completed the installation and commissioning of seven dynamic message signs (DMS) signs along part of I-75 in Michigan.

The signs were installed by J. Ranck Electric as part of the second phase of a project with the 1688 Michigan Department of Transportation (MDOT) and utilised SESA’s unique Messenger 5000 embedded DMS technology to display toll rate, lane status, and traffic control information.

This operation is the second phase of a collaboration between SESA and MDOT and is aimed at increasing efficiency in managing the influx of traffic and reducing queues and congestion on freeways.

The signs were customised to meet client needs, enabling all components to be installed within the sign itself, while maintaining the slim housing design required for the project. The sign housing is less than three inches deep, allowing for easy flush-mounted installation to the static sign panels.

For more information on companies in this article

Related Content

  • Georgia DoT showcases its connectivity
    March 3, 2020
    Georgia DoT’s regional connected vehicle programme could be a model for the rest of the US. Adam Hill speaks to two men involved in making it a reality – and takes a look at the state’s first-ever Tech Showcase
  • Hyperloop One completes Hyperloop full systems test
    July 17, 2017
    Hyperloop One has completed its first full systems Hyperloop test in a vacuum environment at the company’s test track in the Nevada desert. The vehicle coasted above the first portion of the track for 5.3 seconds using magnetic levitation and reached nearly 2Gs of acceleration, while achieving the Phase 1 target speed of 70mph. The company is now entering the next campaign of testing, which will target speeds of 250 mph. Hyperloop One tested all the system's components, including its highly efficient motor,
  • Telegra showcases TopXview
    June 6, 2018
    Telegra is here at ITS America Detroit with a range of ITS solutions that provide better utilisation of existing resources and deploying new technologies in understandable, yet safe and future-proof ways. As the company points out, this is of real value in a world of rapidly evolving information technologies, and even faster growing traffic problems. As one of the leading ITS solutions providers in the world, Telegra says it has unmatched expertise built on 25 years of continuous focus on innovation, and
  • Tighten up on cyber security before hackers infiltrate ITS infrastructure
    October 19, 2015
    This year’s ITS World Congress in Bordeaux will have three sessions dedicated to cyber security and the issue will also be addressed under connected and automated vehicles categories. Jon Masters finds out why. American security researchers Charlie Miller and Chris Valasek attracted international press coverage recently when they demonstrated how they could hack into and take control of a vehicle from a remote laptop. While the implications are clearly serious for vehicle manufacturers, highway and transpor