Skip to main content

ODOT plans ‘smarter highway’

Until they can raise the US$1 billion it would take to expand congestion-plagued Oregon 217, state traffic planners say they'll focus on making it a smarter highway. Oregon Department of Transportation (ODOT) engineers believe that a US$6.5 million artificial traffic intelligence project planned for the 217 corridor will permanently alter the Portland metro area's daily commuting culture. The interconnected system will rely on new underground sensors and advanced computer algorithms. The federal government
May 2, 2013 Read time: 2 mins
Until they can raise the US$1 billion it would take to expand congestion-plagued Oregon 217, state traffic planners say they'll focus on making it a smarter highway.

5837 Oregon Department of Transportation (ODOT) engineers believe that a US$6.5 million artificial traffic intelligence project planned for the 217 corridor will permanently alter the Portland metro area's daily commuting culture.

The interconnected system will rely on new underground sensors and advanced computer algorithms. The federal government is providing most of the funding.

The next phase will happen later this year, when ODOT switches on a series of giant LED screens giving motorists estimated times to key locations and interchanges, as well as crash alerts and lane closures.

Meanwhile, engineers will install sensors into the looping, crash-prone interchange with US 26 that will take moisture readings and flash speed warnings to drivers when the road is wet.

The system is designed to work about a mile-and-a-half before motorists hit serious gridlock, said Matt Beaulieu, a 451 Washington State Department of Transportation engineer.

"Obviously, no one needs to be told to slow if traffic is already crawling," Beaulieu said. "But these are for the people coming up to slow traffic. They're intended to get them to pay attention, to avoid panic braking and erratic last-minute lane changing.

"Ultimately, you can't build your way out of congestion," he said. "But you can make a system that's more reliable, so that the commute doesn't vary so much from day to day."

Related Content

  • Going the distance
    February 27, 2012
    Back in 1982, the TV series Knight Rider was first aired.
  • IP revolution for CCTV systems yet to happen
    February 3, 2012
    The IP Revolution for CCTV systems which has been predicted for some years now has failed to happen, says Craig Howie, commercial director of Visimetrics Ltd. Given the many aspects of different technologies and standards involved in moving high-value, observation-critical applications into a pure digital age, this is perhaps unsurprising, he feels.
  • Island Radar: safely crossing continents
    August 6, 2020
    There is a safety flashpoint wherever roads cross over railways. Island Radar is using well-established traffic technology to keep all parties safe from harm.
  • US state of the art workzone safety
    January 25, 2012
    The Texas Transportation Institute's Jerry Ullman talks about the state of the art in work zone safety in the US. Work zones are places where, perhaps more than anywhere else on the road network, mobility and safety are strongly linked. Historically, field crews and contractors wanted vehicles in work zones to be moving as slowly as possible, assuming that made conditions the safest for work crews. We are though starting to see a shift in such thinking with the realisation that excessive delays or slow-down