Skip to main content

Manchester orbital route to become ‘smart motorway’

Four companies, Balfour Beatty, together with Costain, Carillion and a BAM Nuttall Morgan Sindall joint venture, have been awarded the contract to upgrade a 17 mile stretch of the M60 and M62 to a ‘smart motorway’. The US$313 million upgrade, for the UK Highways Agency, aims to increase capacity, reduce congestion and shorten journey times for motorists. The M60 between junctions 8 and 12 will be upgraded to a controlled motorway with traffic flows managed by technology interventions responsive to the
June 19, 2014 Read time: 2 mins
Four companies, 3902 Balfour Beatty, together with 2002 Costain, 7813 Carillion, 7815 BAM Nuttall and 7814 Morgan Sindall joint venture, have been awarded the contract to upgrade a 17 mile stretch of the M60 and M62 to a ‘Smart motorway’.

The US$313 million upgrade, for the 1841 UK Highways Agency, aims to increase capacity, reduce congestion and shorten journey times for motorists.

The M60 between junctions 8 and 12 will be upgraded to a controlled motorway with traffic flows managed by technology interventions responsive to the volume of traffic on the network.  The M62 between junctions 18 and 20 will become a four-lane, all-lane running motorway by adapting the hard shoulder for continuous use and using electronic signs to manage traffic flows.

Balfour Beatty executive chairman, Steve Marshall said:  “We have been working with the Highways Agency for twenty years and look forward to building on that successful relationship.  This scheme will benefit the 180,000 road users that pass through this section of the motorway network every day. We are committed to lead this project in a collaborative way with our partners, employing local people and businesses in our supply chain.”

For more information on companies in this article

Related Content

  • Balfour Beatty consortium preferred bidder for Aberdeen road project
    June 13, 2014
    The Connect Roads consortium, comprising Balfour Beatty, Carillion and Galliford Try, has been selected as preferred bidder for the design, build, finance and operate (DBFO) contract to deliver the Aberdeen Western Peripheral Route/Balmedie-Tipperty project for Transport Scotland in partnership with Aberdeen City and Aberdeenshire Councils. Balfour Beatty will invest up to US$34 million, which represents a one third share of the sponsor’s investment requirement, with Carillion and Galliford Try also inv
  • Free-flow tolls for new £2bn Thames crossing
    November 16, 2020
    More than 27 million drivers annually may use the planned Lower Thames Crossing near London
  • Motorists worried about safety on smart motorways
    May 9, 2014
    The UK’s Institute of Advanced Motorists (IAM) is calling for more information and advice on smart motorways for drivers. The call comes after seventy-one per cent of drivers said they would feel less safe on a motorway with no hard shoulder than a motorway with one, according to the latest poll by the IAM.
  • Safelane automates work zone perimeter guarding
    June 12, 2015
    The safety of workers during road closures and working alongside, or above, live lanes is becoming an automated process. Ten workers suffered major injuries while working on or near motorways and major A roads in England in 2013, and between 2009 and 2013 eight had been killed. It was against that background that the first commercial application Safelane, the automated traffic management system designed to detect work zone incursions, was carried out during the temporary closure of a motorway.