Skip to main content

California DOT installs driver information signs

California DOT (Caltrans) is installing electronic message signs in an effort to prevent or reduce congestion on the heavily used Interstate 10. Vehicle detection systems have also been installed on the 133 mile stretch of freeway to monitor traffic. The detection systems monitor speed and traffic volume, processing the data and transmitting it to the freeway message signs to give motorists real-time journey time estimates. "Changeable message signs will allow us to deliver information directly to drivers
January 29, 2013 Read time: 2 mins
California DOT (3879 Caltrans) is installing electronic message signs in an effort to prevent or reduce congestion on the heavily used Interstate 10.  Vehicle detection systems have also been installed on the 133 mile stretch of freeway to monitor traffic.

The detection systems monitor speed and traffic volume, processing the data and transmitting it to the freeway message signs to give motorists real-time journey time estimates.

"Changeable message signs will allow us to deliver information directly to drivers before they encounter large traffic back-ups," said Caltrans district 8 director Basem Muallem. "Motorists will be able to take an alternate route to avoid long delays."

The systems were implemented as part of the state's obligations under the Interstate 10 Lifeline Emergency Action Plan.  The Board of Supervisors unanimously agreed in October to partner with the state and tribal governments on implementing the plan, inspired by a series of massive traffic jams on I-10 that left motorists stranded in the last several years, most recently in February 2012.

Caltrans spokeswoman Terri Kasinga said the detection systems' project had been under way since before last February's crunch, but state officials expedited it to meet the action plan goals.

"We are very pleased to see Caltrans move ahead with their pieces of the plan," said Juan Perez, director of the county's Transportation and Land Management Agency. "The traveller information projects will be completed by the end of this year with the larger freeway bypass projects coming later."

Related Content

  • July 18, 2012
    Plug and play approach unifies workzone ITS
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The
  • November 25, 2015
    Arizona DOT to test prototype wrong-way vehicle detection system
    After a comprehensive study of wrong-way driving crashes on state highways and how technology may help reduce the threat, the Arizona Department of Transportation (ADOT) is planning a prototype project to use existing highway sensors to detect wrong-way vehicles and alert authorities and other motorists. ADOT director John Halikowski said the study sets the stage for the agency to develop and test a unique and innovative system to detect and track wrong-way drivers, improving opportunities for law enforceme
  • July 8, 2019
    Cost benefit: Wichita eases workzone congestion
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut
  • August 2, 2012
    Impact of US economic stimulus programme on ITS industry
    Pete Goldin reports on the public sector perspective in this second article exploring the impact of the US economic stimulus programme on the domestic ITS industry The American Recovery and Reinvestment Act (ARRA) was enacted in February 2009 to help stimulate the US economy in the face of global recession. Of measures worth a nominal total of $787 billion, the US Department of Transportation (USDOT) received just over $48 billion with which to promote short-term economic recovery and an additional $1.5 bil