Skip to main content

Balfour Beatty JV to deliver UK smart motorways package

The Balfour Beatty Vinci joint venture has been awarded a contract by Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme. The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshir
July 22, 2015 Read time: 2 mins
The 3902 Balfour Beatty 5176 Vinci joint venture has been awarded a contract by 8101 Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme.

The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshire.

These upgrades are aimed at increasing capacity, reducing congestion and shortening journey times for the thousands of road users who use these parts of the network every day. Extra capacity will be added to the motorways through the conversion of the hard shoulder to a permanent running lane. Electronic signs, operated by a regional control centre, will be installed to manage the flow of traffic in response to driving conditions.

Work on the M5 upgrade is due to start in the autumn of this year. Subject to statutory approval and continued value for money, the M6 is expected to start work in 2017/18 and the M4 scheme in 2016/17. Final target costs for these contracts will be agreed with Highways England.

For more information on companies in this article

Related Content

  • Jacobs JV wins contract for WestConnex New M5 project in Australia
    May 18, 2016
    A joint venture of Jacobs Engineering Group and Aurecon has been awarded a contract to carry out the engineering design for the multi-billion dollar WestConnex New M5 Project in Sydney, Australia. WestConnex is a critical part of the New South Wales (NSW) Government’s integrated transport solution and aims to significantly reduce the congestion impacting hundreds of thousands of NSW road users every day. The New M5, which is expected to double the capacity of the heavily congested M5 East motorway co
  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • Free-flow tolls for new £2bn Thames crossing
    November 16, 2020
    More than 27 million drivers annually may use the planned Lower Thames Crossing near London
  • Traffic monitoring and hard shoulder running
    March 1, 2013
    Hard shoulder running is on the increase – and the detection and monitoring of incidents on affected roads is occupying the minds of experts across Europe and the US