Skip to main content

SESA completes implementation of New Hampshire weigh station signs

SES America (SESA) and its partners New England Traffic Solutions and New England Signal Systems recently completed testing and commissioning of solar powered signs for several weigh stations in New Hampshire. These are installed on the northbound and southbound I-93 near Windham, NH and will be used to display the open/closed status of weigh stations on the highway. SESA provided the latest model of its energy-efficient blank out signs as part of the project, along with a complete solar power system tha
November 4, 2016 Read time: 2 mins
7846 SES America (SESA) and its partners New England Traffic Solutions and New England Signal Systems recently completed testing and commissioning of solar powered signs for several weigh stations in New Hampshire. These are installed on the northbound and southbound I-93 near Windham, NH and will be used to display the open/closed status of weigh stations on the highway.

SESA provided the latest model of its energy-efficient blank out signs as part of the project, along with a complete solar power system that included solar PV panels, batteries, a solar charge controller and other accessories. Utilising solar power reduces installation time and the costs associated with traditional power cabling and power supplied from the grid.  

Both the solar power system and the signs are designed to withstand harsh environments and extreme temperatures; the signs are tested to NEMA TS2 in third party laboratories. Each sign can easily be connected with different monitoring systems and fault detection capabilities, as well as optional full NTCIP functionality.

For more information on companies in this article

Related Content

  • Netherlands to get nationwide network of EV fast-charging stations
    July 8, 2013
    By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
  • Machine vision’s image of road management’s future
    June 11, 2015
    Q-Free’s Marco Sinnema looks at how the commoditisation of high-quality vision-based solutions is widening their application. Machine vision technology’s entry into the ITS/traffic management sector has followed a classic top-down path. This is unsurprising given the extremely demanding performance criteria which are the standard in its market of origin, manufacturing processing. Very high image qualities combined with frame rates often in the hundreds per second range resulted in vision systems with capabi
  • Integrated command and control solution for UK tunnel
    January 27, 2012
    UK company Sicura Systems is supplying a fully fault-tolerant, integrated command and control solution to the US$416 million New Tyne Crossing project on the A19 near Newcastle in England.
  • ABB installs 15 fast chargers for electric vehicles, Iceland
    November 8, 2017
    ON Power, a part of Reykjavik Energy, has signed a contract with ABB for the delivery and installation of 15 Terra multi-standard DC chargers type 53 CJG at various points along Iceland’s main highway. It is part of a plan to expand an e-mobility strategy by increasing the availability of charging stations along central locations of the country’s national highway. The fast chargers can charge an electric vehicle (EV) between 15-30 minutes. It features touch screen displays and graphic visualization